当前位置: Home / Faq / Large air separation FAQ /

Precautions for equipment installation in cold box of air separation unit

Precautions for equipment installation in cold box of air separation unit
Dec 09, 2020
Author: DEAR AST
Question Reply

1.Beforeconnecting the pipe orifice of each container, clean white cloth shall be used to tie the orifice to prevent grease and dirt from entering.

 

2.When welding in the cold box and in the condensing evaporator, it is strictly forbidden for flame or arc to touch the surface of vessels and pipes.

 

3.The containers, valves, pipes and corresponding supports in the cold box, the surface of the cold box and the foundation surface shall not be stained with grease after installation, otherwise, degreasing treatment shall be carried out.

DEAR Air Separation Solve YourPrecautions for equipment installation in cold box of air separation unitYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Pressure swing adsorption and temperature swing adsorption of molecular sieve
2024.12.19
What is the function of the distillation tower in air separation equipment?
2024.12.18
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top