Installation of large air separation unit

Installation of large air separation unit
The installation of large-scale air separation unit has strict process. First of all, the technical requirements should be clarified, the construction technology should be done well, and the preliminary work of installation should be completed. Construction preparation generally includes construction technology preparation, unit material preparation and logistics preparation. It is necessary to prepare the construction organization design, determine the construction scheme, formulate and implement the construction technical measures, and arrange and implement the construction plan.
Faq of Installation of large air separation unit
More
1. Before connecting the pipe orifice of each container, clean white cloth shall be used to tie the orifice to prevent grease and dirt from entering. 2. When welding in the cold box and in the condensing evaporator, it is strictly forbidden for flame or arc to touch the surface of vessels and pipes. 3. The containers, valves, pipes and corresponding supports in the cold box, the surface of the cold box and the foundation surface shall not be stained with grease after installation, otherwise, degreasing treatment shall be carried out.
Mar 12, 2026
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top