Construction requirements for fractionator foundation

Construction requirements for fractionator foundation
Aug 30, 2023
Author: DEAR AST
Question Reply
  1. The cold box foundation is composed of foundation body, water baffle, cold insulation layer and surface layer.

 

  1. The surface of fractionator foundation after completion shall meet the following requirements:
  2. a) There should be no cracks and other defects on the surface;
  3. b) The surface should be clean,and no inflammable materials such as wood board and linoleum are allowed to be carried;
  4. c) Surface flatness < 5 / 1000;
  5. d) The surface levelness is less than 5 / 1000, and the total length shouldnot be more than 15mm.

 

  1. After the foundation is qualified, mark the installation center line of the container according to the installation position of the vessel, and mark the direction and position of the pipe orifice.
DEAR Air Separation Solve YourConstruction requirements for fractionator foundationYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top