How to warm the distillation column of small air separation equipment

How to warm the distillation column of small air separation equipment
Jan 17, 2024
Author: DEAR AST
Question Reply

Newly installedFractionating towerBefore driving and returning to work after stopping for a long time, it must be thoroughly heated and blown off. After being put into operation, whenFractionating towerWhen the failure of liquid suspension can not be eliminated, or the pressure difference before and after the heat exchanger pressure at the end of the operation period is more than 0.5MPa, or the purity of oxygen and nitrogen and the output decrease, it should be heated and blown off.
First of all, make preparations before heating:
1) discharge the liquid in the tower;
2) dismantle the flow meter and thermometer at the outlet of oxygen, nitrogen and distillation, dismantle the upper and lower joints of the liquid air and liquid oxygen level gauge, and dismantle all the pressure gauges except the low pressure gauge;
3) close the high pressure air General inlet valve, joint-1 valve, oxygen and nitrogen products outlet valve and heating Inlet general valve;
4) push openExpanderThe top rod of inlet and outlet valves;
5) openFractionating towerAll through valves, throttle valves, analysis valves, blow-off valves, upper and lower valves of the liquid level gauge, pressure gauge valves and heating valves on the barrel and shell;
6) fill up distilled water of the heating furnace.
The operation of heating is as follows: startAir compressor, When the pressure of the purifier rises to the normal working pressure, slowly open the heating main inlet valve, and use this valve to control the pressure of the purifier under the normal working pressure. After blowing with dry air for half an hour, switch on the heating furnace and control the outlet air temperature of the heating furnace to 70 ~ Between 80℃. During heating, the temperature of each outlet should be adjusted frequently. Close the outlet valve with high temperature a little smaller, and open the outlet valve with low temperature a little bigger, and pay attention to that the upper tower pressure should not be greater than the normal working pressure at any time. When the outlet temperature is higher than room temperature (15℃ in summer and above 5℃ in winter), heating can be stopped after the gas is dried. 0.5 before heating ends ~ 1 h, each throttle valve stem should be pulled out to blow off, and the impurities in the screw thread of the valve stem and the moisture in the valve sleeve should be removed to prevent the flexible rotation during normal operation.

DEAR Air Separation Solve YourHow to warm the distillation column of small air separation equipmentYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top