What are the technical requirements of the distillation column under the air separation plant?

What are the technical requirements of the distillation column under the air separation plant?
Aug 14, 2023
Author: DEAR AST
Question Reply

Answer: 1. The manufacture, inspection and acceptance of the lower distillation column comply with the provisions of JB/T2549-1994 "aluminum air separation equipment manufacturing technical specification" and JB/T4734-2002 "Aluminum Welding container.

2. the welding joints of Class A and B of containers should be tested 100% Ray to meet the second level requirements of JB/t4730-2005 non-destructive testing of pressure equipment; the welding joints of class C and D and those that cannot be detected by Ray should be 100% penetrated to meet the level I requirements of JB/t4730-2005.
3. after the container is manufactured and compounded with the main cold, use dry and clean air or nitrogen to 0. 69MPa conduct the barometric test on the surface pressure, keep the pressure for 30 min, and there should be no obvious deformation or leakage, and then reduce it to 0. 6MPa conduct the air tightness test under the pressure gauge, and keep the pressure Zh from leaking.
4. Test procedures refer to pressure vessel safety technology supervision regulations.
5. All parts must be oiled before assembly or after repair, and the cleanliness should meet the relevant requirements of JB/T 6869-1993 air separation equipment surface cleanliness.
6. The distance between the weld line of the tube and the plane of the tower plate is 90mm, and the strengthening nut should be riveted tightly after tightening to prevent loosening.

DEAR Air Separation Solve YourWhat are the technical requirements of the distillation column under the air separation plant?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
In the process of operation, especially in the start-up and shutdown of the air separation unit, one-way force should be avoided on the instrument. During the start-up of the equipment, close the high pressure and low pressure valves firstly, then open the balance valve, and then slowly open the high pressure (or low pressure) valve, so that the measured medium can enter the positive (negative) pressure chamber of the transmitter. If the liquid is to be measured, the gas in the positive (negative) pressure chamber should be discharged from the upper vent. If the gas is measured, drain the liquid accumulated in the positive (negative) pressure chamber from the lower drain screw hole. After discharging the gas (liquid), close the balance valve, and then open the valve on the other side. When the equipment is shut down, the high pressure (or low pressure) valve should be closed first, then the balance valve should be opened, and then the valve should be closed on the other side. Someti
2026.07.31
What are the reasons why the oxygen production of air separation equipment cannot meet the target
2026.07.30
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top