How to determine if there is a leakage inside the air separation equipment?

How to determine if there is a leakage inside the air separation equipment?
Jan 24, 2024
Author: DEAR AST

When there is a leak in the cold box of the air separation tower, the cooling capacity to maintain normal production appears insufficient. Therefore, the main sign is the continuous decrease of the main cooling liquid level.

If a large amount of gas leaks, an increase in pressure inside the cold box can be observed. If the cold box is not tight, a large amount of cold air will emerge from the gap. However, when low-temperature liquid leaks, there is no obvious increase in pressure or gas escape, and a significant decrease in the base temperature can often be measured.

In order to make a preliminary judgment on the leakage location and material before shutdown for maintenance, and to shorten the downtime, the following methods are comprehensively used:

(1) It tests the purity of the gas escaping from the cold box. When nitrogen or liquid nitrogen leaks, the purity of nitrogen reaches over 80%, and when oxygen or liquid oxygen leaks, the purity of oxygen significantly increases.

(2) Observe the "sweating" or "frosting" area on the cold box wall. At this time, pay attention to the "frosting" area located below the leakage point when low-temperature liquid leaks.

(3) Observe if there is any regularity in the escape of gas.

DEAR air separation equipment manufacturing achieves safe operation and maintenance, stable and efficient operation.

DEAR Air Separation Solve YourHow to determine if there is a leakage inside the air separation equipment?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top