How to load the molecular sieve of the molecular sieve purifier in the air separation equipment

How to load the molecular sieve of the molecular sieve purifier in the air separation equipment
Oct 25, 2023
Author: DEAR AST

Before filling the molecular sieve, it is necessary to check that there is no leakage of the molecular sieve in the sieve bed, otherwise it needs to be dealt with. There should be no oil or other debris inside the tank; Personnel participating in filling should not wear work shoes with nails to avoid damaging the sieve bed; Wear clean and oil-free work clothes. Several standard height marks need to be made in the middle part. First, check the ring chamber and fill it with aluminum glue to reach the standard height, then fill it with molecular sieve. Due to the large amount of molecular sieves used, there are generally some differences in the molecular sieves produced by different kilns. Therefore, it is necessary to evenly fill the molecular sieves of the same batch of kilns into two molecular sieve tanks.

After the filling is completed, first use a leveling mechanism to level the molecular sieve and check if it reaches the standard height (the annular chamber has been buried below the molecular sieve). Repeat the leveling work on the molecular sieve until the molecular sieve on the sieve bed is flat and there are no unevenness issues. After checking that there are no issues, it can be considered that the filling work is completed.

DEAR Air Separation has rich project engineering experience and continuously utilizes innovative technologies to optimize equipment energy conservation and safety. It is a major manufacturer and gas supplier of air separation equipment in China.

DEAR Air Separation Solve YourHow to load the molecular sieve of the molecular sieve purifier in the air separation equipmentYou can also learn about otherBiogas purification FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
How to make high purity nitrogen
2026.02.12
Liquid air separation plant piston compressor clearance volume is: the compressor at the end of the exhaust, the piston and the cylinder end of the wall between the residual part of the high pressure gas occupied by the cylinder volume. The existence of the residual volume directly reduces the exhaust volume of the compressor, at the same time, the suction of this part of the high pressure gas expansion, will also cause a delay in the suction process, the reduction in suction volume, ultimately ...
2026.02.11
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top