当前位置: Home / Faq / Liquefied air separation FAQ /

Can filling the tower with liquid oxygen be used to shorten the start-up time of the air separation equipment

Can filling the tower with liquid oxygen be used to shorten the start-up time of the air separation equipment
Aug 23, 2023
Author: DEAR AST

The start-up of an air separation plant includes three stages: cooling, liquid accumulation, and purification. For a certain device, the time required to start is generally a certain amount. For low-pressure air separation equipment, there is no room for adjusting the pressure of the air compressor. Generally, it is necessary to equip two expanders to work simultaneously to increase the cooling capacity during the start-up phase and shorten the start-up time. Even so, according to the maximum cooling capacity and the cooling capacity required for cooling and liquid accumulation of the device, the start-up time of the device also needs to be more than 36 hours.

Large air separation equipment is generally equipped with liquid oxygen storage tanks as emergency backup oxygen. If necessary, can liquid oxygen be filled into the tower to shorten the start-up time of the air separation equipment? In theory, it is completely possible. For example, if 1m3 of liquid oxygen is backfilled into the main cooler, it is equivalent to providing 0.47 from the outside × The cooling capacity of 106kJ is approximately 5000m3 of expanded air, which is the cooling capacity within 2 hours. Some factories have conducted experiments, filling 20m3 of liquid oxygen into the tower during startup, which can shorten the startup time by 16.5 hours for 6500m3/h air separation equipment; For 10000m3/h air separation equipment, the start-up time can be shortened by more than 8 hours.

Of course, when filling the tower with liquid oxygen, one thing to pay attention to is the timing. It is important to wait until the device cools down to the point where liquid begins to be generated in the main cooling chamber before filling it in to avoid damaging the equipment due to thermal stress caused by excessive temperature difference; The second is to pay attention to the filling pressure. Because liquid oxygen can only be injected above the pressure at the bottom of the upper tower, but it cannot exceed the set pressure of the safety valve of the liquid oxygen storage tank to prevent the safety valve from acting.

DEAR Air Separation Solve YourCan filling the tower with liquid oxygen be used to shorten the start-up time of the air separation equipmentYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top