当前位置: Home / Faq / Biogas purification FAQ /

What are the requirements for safety technology management of gas cylinder filling units

What are the requirements for safety technology management of gas cylinder filling units
Mar 31, 2023
Author: DEAR AST

1) The station must be established after being reviewed and approved by relevant departments in accordance with the provisions of the "Regulations on the Safety Management of Hazardous Chemicals" and the "Regulations on the Safety Supervision of Gas Cylinders" promulgated by the State Council;

2) The filling station shall go through the registration formalities with the boiler and pressure vessel safety supervision institution of the labor department, and can only engage in gas filling work after passing the on-site assessment;

3) The production equipment, buildings, and safety facilities of the filling station must comply with the regulations on fire prevention, explosion prevention, and environmental protection;

4) The filling station must establish a management system to ensure filling quality and safety, such as safety education, training, fire and explosion prevention, storage and transportation, and equipment maintenance systems, and have technical data such as standards and specifications related to the filled gas and gas cylinders;

5) The filling station should have facilities that meet the requirements of environmental protection, public security, labor, and other departments to replace or handle flammable and harmful gases in the bottle;

6) The filling station should have a workshop, site, filling equipment, safety facilities, as well as laboratory and detection instruments and tools appropriate to the type and output of the gas filled;

7) According to the specific regulations of GBl894, safety signs should be set up at eye-catching places inside and outside the filling station according to the gas characteristics;

8) The filling station shall be equipped with a full-time technical director with a technical title of engineer or above (including engineer);

9) The filling station should be equipped with full-time safety officers with a high school education or above and qualified in professional technical training;

10) The filling station should be equipped with gas filling inspectors, product quality testers, and cylinder administrators with a junior high school education or above and qualified in professional technical training;

11) The filling station should be equipped with gas filling personnel with a junior high school education or above, who have received professional technical training and passed the assessment by the local labor department, and there should be no less than two gas filling personnel per work shift;

12) Personnel engaged in loading, unloading, transporting, and receiving and dispatching gas cylinders at the filling station should master the relevant safety knowledge, regulations, and standards for the filled gas and its cylinders.

DEAR Air Separation Solve YourWhat are the requirements for safety technology management of gas cylinder filling unitsYou can also learn about otherBiogas purification FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The most likely leakage of switching heat exchanger is the welding line, especially the joint of the head and the pipeline. Most of the causes of leakage are the quality problems of manufacture and installation, which are also related to maintenance. The working condition of switching heat exchanger is poor. It is not only impacted by alternating airflow, but also changes greatly in airflow temperature. In long-term operation, the weak parts are easy to leak. Therefore, the welding quality should be strictly guaranteed during manufacture and installation. After installation, strict leak detection and pressure test must be carried out before driving, and problems should be dealt with timely to avoid passivity after driving. There are three methods to check whether the switching heat exchanger leaks in operation: 1) flow method. When a large amount of leakage occurs between the channel of product oxygen or product nitrogen and air channel, the output of oxygen or nitrogen increases ob...
2024.03.29
Oxygen product: liquid oxygen is pumped out from the lower tower plate of the low pressure tower and sent to the storage tank, the inner compressed oxygen pump is placed next to the liquid oxygen storage tank, the liquid oxygen extracted from the storage tank is pressurized by the oxygen pump and sent out after gasification and reheating in the main heat exchanger to get the required oxygen product in liquid air separation plant. The nitrogen product is pumped from the top of the pressure tower...
2024.03.28
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top