What are the requirements for the management of molecular sieve purification system of air separation equipment

What are the requirements for the management of molecular sieve purification system of air separation equipment
Feb 04, 2024
Author: DEAR AST

One important aspect of the management of molecular sieve purification system is the management of "switching device".

The Molecular Sieve Purifier needs to be inspected once a week to check whether the specified temperature is reached during regeneration and cooling, and whether the switching time meets the requirements. If there is any abnormality, it should be adjusted in time. After the purifier is used for one to two years, the particle breakage of molecular sieve and activated alumina shall be measured. If necessary, all the particles shall be taken out and screened to remove the powder and particles. When sieving, be sure to carefully blow and sift to completely remove the particles and powder deposited on it. Molecular sieves and activated alumina should be added or replaced as required. When adding or replacing, molecular sieves and activated alumina from the original supplier should be selected, and the height of the adsorption layer should be ensured to reach the specified thickness.

In addition to providing domestic and foreign customers with high-quality complete sets of air separation equipment, DEAR air separation also provides customers with air separation equipment maintenance for a long time. The operation requirements of each system have relevant technical documents.

DEAR Air Separation Solve YourWhat are the requirements for the management of molecular sieve purification system of air separation equipmentYou can also learn about otherBiogas purification FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top