Standardisation of electrical processes for large air separation units

Standardisation of electrical processes for large air separation units
May 24, 2022
Author: DEAR AST

Centralised drainage design for the whole machine
①For small air separation units and downhole equipment, a fixed and uniform centralised drainage outlet is designed on the skid block.
②For large air separation units, the centralised drainage components are prefabricated in the workshop according to the design and taken away with the delivery, and then incorporated into the drainage line during installation on site according to the actual situation on the customer's side.

Design of the operating instructions for the liquid air separation plants
Change the current operation manual content is cumbersome. The status quo of operation is not strong, and the contents of the manual are streamlined and enriched to enhance its practicality.

Standardised design of electrical processes
Standardised design of electrical processes, including standardisation of electrical control schemes. Standardisation of the assembly process. Standardisation of external wiring, standardisation of electrical wiring process drawings and standardisation of program design, comprehensive standardisation of electrical design and wiring work, and improvement of the industrial level of electrical application of equipment.
① Standardisation of control schemes Preparation of "Technical documentation on standardised control schemes for small air separation units, large air separation units and liquid air separation plants" with detailed tables.

DEAR has led the development of many innovative technologies, such as the new main condensing evaporator, self-cleaning filter, energy-saving oxygen generator, energy-saving air separation nitrogen water pre-cooling system, ultra-low-pressure air separation unit, double-stage fractionation tower with liquid lift function for low-pressure air separation equipment.

24836196B8833A0945BBE37D57EAB25E


Translated with www.DeepL.com/Translator (free version)

DEAR Air Separation Solve YourStandardisation of electrical processes for large air separation unitsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
When the amount of treated air increases, the rising steam in the distillation column will increase, and the amount of liquid to be condensed in the main cooler will increase accordingly, so it has no effect on the reflux ratio in the column. The purity of oxygen and nitrogen remained unchanged in a certain range with the increase of gas volume, and the output increased proportionally with the increase of gas volume. However, with the increase of the amount of condensate in the main cooler, the heat load of the main cooler increases. When the heat transfer area is insufficient, the temperature difference of the main cooler will inevitably expand, and the pressure of the lower column will increase accordingly. At the same time, with the increase of gas velocity in the column, the amount of downflow liquid increases, and the liquid layer on the tray thickens, which increases the resistance of the tray and the pressure of the upper and lower columns. This will adversely affect the sepa
2026.07.15
How to accurately control the purity and energy efficiency of air separation distillation by improving quality and reducing consumption?
2026.07.14
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top