The large air separation unit cold box maintenance work

The large air separation unit cold box maintenance work
May 19, 2022
Author: DEAR AST

The inspection work includes setting up scaffolding from bottom to top in the cold box and entering the cold box to check the specific damage to the piping. The liquid-air return pipe of the crude argon tower was bent and deformed, and the RTD cable on the liquid-air pipe was disconnected, and the safety valve pipe of the liquid-air steam of the crude argon tower was deformed and extruded together with the safety valve pipe of the condenser of the fine argon tower. The fine argon tower evaporator does not condense gas and the blow-off tube is disconnected from the tower root. Fine argon tower evaporator liquid nitrogen export pipe deformation large, liquid argon metering pipe argon gas return to fine argon tower pipe deformation serious. Cold box inflatable tube in the middle of the bending tilt, the main tower and the top of the rough argon tower tie rod is obviously loose, the main change of cold box and the main cold box between the bulkhead is frozen crack. The air separation equipment overhaul workers then carried out specific overhaul work based on the damage inspected and the contractual technical agreement.

DEAR Air Separation small air separation unit, large air separation unit and liquid air separation plant technical team has rich experience in cold box overhaul work to ensure the smooth and safe operation of large air separation units and the output of small air separation unit products.微信图片_20200217112035

DEAR Air Separation Solve YourThe large air separation unit cold box maintenance workYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The plant operation cycle between two large heating is related to many factors. From an operational point of view, this mainly depends on when the air passage of the main heat exchanger is blocked. The main reason for the blockage is that the moisture and carbon dioxide content in the air entering the unit exceeds the standard, which accumulates and freezes in the main heat exchanger until it is blocked. The abnormal operation of molecular sieve purification system will shorten the operation cycle of the unit. It is mainly caused by the following reasons: 1. The molecular sieve adsorption bed is short circuited. In the process of operation, due to the unstable gas velocity control or switching, the pressure difference between the two tanks is too large, which will affect the bed layer, make the molecular sieve bed uneven and make the bed layer short circuit. In serious cases, the dust screen of the adsorber will break and the molecular sieve powder will enter the heat exchanger c
2026.03.30
What is the oxygen internal compression process
2026.03.27
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top