How to degrease in small air separation unit

How to degrease in small air separation unit
Dec 01, 2025
Author: DEAR AST

It is recommended to degrease aluminium parts (pressure vessels, valves, pipelines) with perchloroethylene or trichloroethylene solvents, and carbon tetrachloride (CC14) solvents are strictly prohibited. The solvent must be oil-free and degreased, and decomposed solutions are not allowed. Organic solutions are not suitable for assemblies with rubber, plastic or organic coatings. Organic solvents are toxic and flammable and should be used with care.

 

In addition to using the above degreasing solution for degreasing, other methods are available for degreasing such as alkali washing, the process needs to prevent metal rusting caused by too high a concentration of alkali solution. After degreasing the pipe, it is advisable to weld within 24h and to prevent secondary pollution. The cleanliness of the degreasing can be checked visually and qualitatively with a UV lamp or by other methods.

 

External carbon steel oxygen pipes, valves and all other parts in contact with oxygen must be strictly descaled and degreased before installation and use, either by sandblasting (quartz sand only), pickling or carbon tetrachloride and other highly effective non-combustible detergents. After descaling and degreasing the pipes should be immediately passivated or filled with dry nitrogen.

 

Dear air Separation manufactures quality first-class small air separation unit, strict control each stage of product quality.

山东钢铁集团(壶井)

 

 

 

DEAR Air Separation Solve YourHow to degrease in small air separation unitYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Before filling with pearlite, the water accumulated on the foundation surface of air separation unit must be removed, dried with hot air, and all manholes shall be closed. 2. When filling pearlite, all containers and pipes in the cold box should be inflated and kept at 50kPa pressure, then slightly open the valve of each meter pipeline, and all thermometers should be electrified to check whether the thermometer cable is damaged during the filling process. 3. The filled pearlite shall not be mixed with combustibles. 4. When filling with pearlite, coarse mesh or pearlite pouring device should be set at the manhole on the top of the cold box to prevent whole bag pearlite from entering the cold box. 5. After the pearlite is filled, the manhole shall be sealed.
2026.08.18
What is the oxygen extraction rate?
2026.08.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top