当前位置: Home / Faq / Liquefied air separation FAQ /

Requirements for orifice plate installation

Requirements for orifice plate installation
Dec 04, 2024
Author: DEAR AST

The poor installation quality of orifice flowmeter will affect the reading accuracy of orifice flowmeter. In order to improve the reading accuracy of orifice flowmeter, the following points should be paid attention to in the installation of orifice flowmeter: the installation position of orifice flowmeter should be in the straight pipe section, in the pipe with a distance of ten times the diameter of orifice before and five times the diameter of orifice behind, no protruding plastics, welding marks and dirt are allowed. The installation direction of the orifice plate should not be wrong, and the sharp edge of the inlet should face the flow direction of the fluid; The center of the orifice plate must coincide with the center of the pipe, because that the coefficient K in the flow calculation formula is related to the fluid density and other factors.

DEAR Air Separation Solve YourRequirements for orifice plate installationYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top