当前位置: Home / Faq / Large air separation FAQ /

Overall heating in cold state

Overall heating in cold state
May 27, 2021
Author: DEAR AST

In order to remove the residual water, carbon dioxide, acetylene and other impurities to ensure the long-term stable operation of the next cycle. After the shutdown of the air separation unit, it is necessary to conduct comprehensive heating and blowing, that is, comprehensive heating in cold state. The program is shutdown, liquid discharge, standing, cold blowing, heating and system blowing. When the outlet temperature reaches normal temperature, it can be stopped.

DEAR Air Separation Solve YourOverall heating in cold stateYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Before the air cooling columnand water cooling columnare hoisted in place, the anchor hole shall be cleaned, and there shall be no water and debris in the anchor hole.   After the air cooling columnand water cooling columnare hoisted in place, the perpendicularity of the equipment shall be checked. The perpendicularity shall be ≤ 1/1000 and the total length shall not exceed 10mm.   The bottom of the anchor bolt shall not touch the bottom of the reserved anchor hole. Af...
2026.09.03
What are biogas purification technologies
2026.09.02
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top