当前位置: Home / Faq / Large air separation FAQ /

What should be paid attention to in molecular sieve purification of air separation unit

What should be paid attention to in molecular sieve purification of air separation unit
Apr 22, 2021
Author: DEAR AST

Molecular sieve purification of air separation unit includes cooling unit stage, liquid accumulation stage and three chamber adjustment stage. In the start-up process, the main focus is to give full play to the refrigeration capacity of the expander, reasonably distribute the cooling capacity and fully cool the unit.

 

Attention should be paid to the following aspects:

 

  1. The molecular sieve used for the first time should be activated and regenerated once to remove the water and carbon dioxide adsorbed during transportation and filling. The activation temperature is generally higher than 200 ℃ and lower than 250 ℃. When the outlet temperature reaches 80 ℃, it can be cold blown. The activation time is not less than two cycles;

 

  1. When the molecular sieve is started, the air supply process should be slow, and the vent valve should be carefully closed to prevent the molecular sieve in the bed from being damaged due to pressure fluctuation;

 

  1. When the two expanders need to be started, the return valve of the booster should be fully opened to reduce the pressure of the first expander, and then the two expanders should be loaded at the same time to prevent the surge of the later booster;

 

  1. Pay attention to the temperature control in the middle of the heat exchanger;

 

  1. Pay attention to the work of air cooling columnto ensure that the air after precooling meets the design requirements.
DEAR Air Separation Solve YourWhat should be paid attention to in molecular sieve purification of air separation unitYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top