当前位置: Home / Faq / Large air separation FAQ /

Installation requirements for cold box of air separation unit

Installation requirements for cold box of air separation unit
Jun 26, 2026
Author: DEAR AST
Question Reply

1.The cold box foundation is divided into frame type and non frame type. The levelness of top surface of frame type frame shall not exceed 1 / 1000. All sections of the frame shall be placed vertically. All bottom plates of non frame type cold box shall be kept at the same level, and the levelness shall not exceed 1 / 1000.

 

2.When installing the cold box plate, the adjacent two sides can beassembled into a whole piece or angle type on the ground. The length error of each diagonal line and the perpendicularity error of four sides shall be in accordance with table 2.

 

Table 2                                                                      mm

Size

Tolerance zone

Larger than

to

1000

2000

±3

2000

4000

±4

4000

8000

±5

8000

12000

±6

12000

16000

±7

16000

20000

±8

20000

 

±9

 

3.The upper end face level of box plate can be adjusted by thin steel plate gasket between foundation frame and framework steel. The width of the steel plate to be padded shall be the same as that of the corresponding section steel.

 

4.The installation nuts and bolts between the frames should be spot welded firmly. The inner side of the section steel between the frames is intermittent welding with a spacing of 150 mm and a weld length of 50 mm. Its outer side is continuous seal welding (see Figure2). The continuous welding outside the whole cold box must meet the requirements of the air tightness of the cold box.

20201222

5.The vertical deviation of the cold box installation is less than or equal to 1.5/1000, but the vertical deviation of the total height of the cold box shall not be greater than 20 mm, or according to the drawing requirements.

DEAR Air Separation Solve YourInstallation requirements for cold box of air separation unitYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
According to the daily water quality analysis and laboratory results, supplement the discharge water and control the dosing amount to make it reach the required data index. When the turbidity is >20mgL, increase the amount of drainage water, increase the flow of side filtration, and supplement clean water. According to the current situation of the circulating water system, try to increase the concentration multiple operation to save water and medicine. If the concentration multiplier is g...
2026.09.04
Before the air cooling columnand water cooling columnare hoisted in place, the anchor hole shall be cleaned, and there shall be no water and debris in the anchor hole.   After the air cooling columnand water cooling columnare hoisted in place, the perpendicularity of the equipment shall be checked. The perpendicularity shall be ≤ 1/1000 and the total length shall not exceed 10mm.   The bottom of the anchor bolt shall not touch the bottom of the reserved anchor hole. Af...
2026.09.03
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top