Question Reply

In order to check the installation quality, deformation under low temperature and smooth condition of pipelines, valves and field installed air separation plant in air separation column, needs to be further tighten the flange bolts at low temperature. It is necessary to start freezing before filling the cold insulation box with cold insulation material, which is called naked cooling. During naked cooling, the rectification column, main condensing evaporator and other main equipment shall be cooled to the minimum temperature for 2 hours respectively, and then the whole air separation unit shall be cooled for 3 to 4 hours. The deformation and leakage of each part shall be checked in detail, and the flange bolts shall be tightened again. After defrosting, the flange shall be heated to normal temperature before gas seal test can be conducted.

DEAR Air Separation Solve YourNaked cooling of air separation plantYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The liquid air separation plant system uses the cold energy to produce liquid oxygen, liquid nitrogen and liquid argon in an air separation system, including an air compression pre-cooling system, an air purification system, an air separation system and a nitrogen circulation system for liquid air separation plant cold recovery. the nitrogen circulation system for liquid air separation plant cold recovery is placed in a separate cold box from the main cold box of the air separation system. the l...
2026.08.03
In the process of operation, especially in the start-up and shutdown of the air separation unit, one-way force should be avoided on the instrument. During the start-up of the equipment, close the high pressure and low pressure valves firstly, then open the balance valve, and then slowly open the high pressure (or low pressure) valve, so that the measured medium can enter the positive (negative) pressure chamber of the transmitter. If the liquid is to be measured, the gas in the positive (negative) pressure chamber should be discharged from the upper vent. If the gas is measured, drain the liquid accumulated in the positive (negative) pressure chamber from the lower drain screw hole. After discharging the gas (liquid), close the balance valve, and then open the valve on the other side. When the equipment is shut down, the high pressure (or low pressure) valve should be closed first, then the balance valve should be opened, and then the valve should be closed on the other side. Someti
2026.07.31
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top