Naked cooling of air separation plant

Naked cooling of air separation plant
Nov 07, 2024
Author: DEAR AST
Question Reply

In order to check the installation quality, deformation under low temperature and smooth condition of pipelines, valves and field installed air separation plant in air separation column, needs to be further tighten the flange bolts at low temperature. It is necessary to start freezing before filling the cold insulation box with cold insulation material, which is called naked cooling. During naked cooling, the rectification column, main condensing evaporator and other main equipment shall be cooled to the minimum temperature for 2 hours respectively, and then the whole air separation unit shall be cooled for 3 to 4 hours. The deformation and leakage of each part shall be checked in detail, and the flange bolts shall be tightened again. After defrosting, the flange shall be heated to normal temperature before gas seal test can be conducted.

DEAR Air Separation Solve YourNaked cooling of air separation plantYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Answer: select the small cryogenic air separation unit with argon, and give priority to verifying the real continuous operation performance of the unit with argon below 1000nm ³/h, avoiding the scheme with only drawings and no long-term operation record. Key dimensions of model selection: 1. operation performance: it is confirmed that the manufacturer has a long-term stable production case of small flow air separation with argon. Deere air separation small-scale hydrogen free total distillation argon extraction air separation, supports scale customization below 1000nm ³/h, and is equipped with intelligent control system, with mature landing performance. 2. power consumption per unit liquid argon
2026.11.06
Answer: the default unit gauge pressure is MPa (g), and the mainstream is cryogenic full low pressure external compression process. Design pressure of conventional energy-saving models in the industry: 0.50~0.55 MPa (g); The lower limit of stability of ordinary process is about 0.45 MPa (g). In general, it is not recommended to be lower than 0.42 MPa (g) for a long time in the conventional scheme. If the pressure is too low, there will be risks such as poor heat exchange in the precooling tower, insufficient purification of molecular sieve, difficult to balance the cooling capacity, and the air compressor close to the surge area. The internal compressed air is distributed with a booster. The main air compressor is mostly 0.55~0.65 MPa (g), and the lower limit is mostly 0.50 MPa (g), which is difficult to achieve below 0.45MPa (g). Deere air separation ultra-low discharge pressure patented energy-saving external compression air separation, through the collaborative optimization of the w
2026.11.06
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top