What should be done when the power supply of the air separation plant of the molecular sieve adsorption purification process is restored after the power failure?

What should be done when the power supply of the air separation plant of the molecular sieve adsorption purification process is restored after the power failure?
Oct 10, 2024
Author: DEAR AST
Question Reply

Molecular sieve adsorption purification processAir separation equipmentWhen the power supply is restored after the power failure, the operation should follow the following steps:
1) judge the possible influence on mechanical equipment such as air compressor when the power is suddenly cut off. If there is no influence, according to the operation specification of the air compressorAir compressorStart-up preparation;
2) check and confirm the switch state of the chain shutdown equipment valve;
3) check and confirm the alarm chain project of the air separation plant. Re-check and confirm the chain control of failure during power failure;
4) start the air compressor and air precooling system according to regulations;
5) start the molecular sieve adsorber according to the regulations. Continue to complete the process before shutdown. If the downtime is long (more than 24 h), the molecular sieve adsorber should recycle for one cycle;
6) according to the length of downtime, the cold end temperature of the main heat exchanger and the main cold liquid level, etc., according to the regulations to determineAir separation equipmentStart the startup procedure.

DEAR Air Separation Solve YourWhat should be done when the power supply of the air separation plant of the molecular sieve adsorption purification process is restored after the power failure?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Before filling with pearlite, the water accumulated on the foundation surface of air separation unit must be removed, dried with hot air, and all manholes shall be closed. 2. When filling pearlite, all containers and pipes in the cold box should be inflated and kept at 50kPa pressure, then slightly open the valve of each meter pipeline, and all thermometers should be electrified to check whether the thermometer cable is damaged during the filling process. 3. The filled pearlite shall not be mixed with combustibles. 4. When filling with pearlite, coarse mesh or pearlite pouring device should be set at the manhole on the top of the cold box to prevent whole bag pearlite from entering the cold box. 5. After the pearlite is filled, the manhole shall be sealed.
2026.08.18
What is the oxygen extraction rate?
2026.08.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top