What are the technical maintenance of power equipment?

What are the technical maintenance of power equipment?
Nov 16, 2023
Author: DEAR AST
Question Reply

Technical maintenance of power equipment includes:
(L) daily inspection and inspection tour by the operation personnel of the power station according to the specified time, route, project and requirements, make use of human senses or simple instruments and meters to test and inspect the equipment, observe, record the running condition of the equipment and the intact condition of the safety facilities, and timely find outAir separation equipmentDefects and hidden dangers, and take corresponding maintenance measures to ensure the normal operation of power equipment.
In daily spot inspection and round inspection, for the new equipment which has just been put into operation, and the equipment which has restored operation after major accidents occur, the equipment operating under severe weather conditions (such as strong wind, thunder, rain, hailstones, snow, frost, fog, etc.) is regarded as the key inspection content. As for the power equipment (such as the power distribution cabinet in the workshop, low-voltage distribution room, etc.) which is under the supervision and control of the personnel on duty, it should be inspected and inspected by professional maintenance personnel. Special inspection tour is needed for some power equipment. For example, the substation should conduct at least one inspection tour of closing lights at night every month, and check whether there is flashover or glow discharge in the running electric circuit and related devices.
(2) regular inspection on the basis of daily maintenance, according to the defects and seasonal requirements of power equipment, regularly check and clean the equipment, add or replace insulation oil and lubricating oil, repair or replace related components, etc. Through regular inspection, we can also confirm or revise the work items and workload that should be completed in the next overhaul.
(3) preventive test (inspection) the purpose of preventive test (inspection) is to check the operational reliability and safety of the power equipment and the power pipeline during the two adjacent planned repairs, and to find hidden dangers in time, prevent accidents. The interval and content of preventive test should be conducted according to the requirements of relevant regulations and instructions.

DEAR Air Separation Solve YourWhat are the technical maintenance of power equipment?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top