What measures should be taken when the pre cooling system of the air separation equipment malfunctions?

What measures should be taken when the pre cooling system of the air separation equipment malfunctions?
Mar 18, 2025
Author: DEAR AST

When the pre cooling system of the air separation equipment malfunctions, the following measures can be taken to ensure that the air separation unit can maintain short-term operation and restore normal operation as soon as possible:
1. Moderate reduction of air volume: By adjusting the intake valve, the amount of air entering the air separation equipment can be appropriately reduced to alleviate the load on the pre cooling system, especially the molecular sieve adsorber.
2. Shorten adsorption cycle: Adjust the adsorption cycle of the molecular sieve adsorber to ensure that it operates within the allowable adsorption capacity range and prevent a decrease in adsorption efficiency due to prolonged adsorption time.
3. Monitoring carbon dioxide content: closely monitor the carbon dioxide content in the air at the outlet of the adsorber to ensure that it is within the specified range (such as below 1 × 10 ^ -6 or below 1ppm), and prevent carbon dioxide from entering the main heat exchanger and distillation tower and causing blockage.
4. Adjust nitrogen flow rate: Reduce the product nitrogen flow rate appropriately, while increasing the nitrogen flow rate of the decontamination nitrogen cooling tower to lower the temperature of the cooling water, which can help improve the pre cooling effect.
5. Increasing the flow rate of cooling water: Increasing the flow rate of ordinary cooling water can improve the heat dissipation efficiency of the pre cooling system and help reduce the system temperature.

DEAR Air Separation Solve YourWhat measures should be taken when the pre cooling system of the air separation equipment malfunctions?You can also learn about otherHigh purity nitrogen air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The plant operation cycle between two large heating is related to many factors. From an operational point of view, this mainly depends on when the air passage of the main heat exchanger is blocked. The main reason for the blockage is that the moisture and carbon dioxide content in the air entering the unit exceeds the standard, which accumulates and freezes in the main heat exchanger until it is blocked. The abnormal operation of molecular sieve purification system will shorten the operation cycle of the unit. It is mainly caused by the following reasons: 1. The molecular sieve adsorption bed is short circuited. In the process of operation, due to the unstable gas velocity control or switching, the pressure difference between the two tanks is too large, which will affect the bed layer, make the molecular sieve bed uneven and make the bed layer short circuit. In serious cases, the dust screen of the adsorber will break and the molecular sieve powder will enter the heat exchanger c
2026.03.30
What is the oxygen internal compression process
2026.03.27
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top