当前位置: Home / Faq / Biogas purification FAQ /

Air separation equipment molecular sieve purification in which aspects should be noted?

Air separation equipment molecular sieve purification in which aspects should be noted?
Jun 03, 2024
Author: DEAR AST

Air separation equipment molecular sieve purification, one is the cooling equipment stage, the second is the accumulation of liquid stage, the third room to adjust the working condition stage. In the start-up process mainly focuses on giving full play to the refrigeration capacity of the expander, reasonably distributing the cooling capacity, and comprehensively cooling the equipment.
Attention should be paid to the following aspects: the molecular sieve used for the first time should be activated and regenerated once, with the purpose of removing the water and carbon dioxide adsorbed in the process of transport and filling. Activation temperature is generally higher than 200 ℃, lower than 250 ℃, when the outlet temperature reaches 80 ℃ can be cold blowing, activation time of not less than two cycles;
When the molecular sieve start-up process to send gas slowly, the venting valve should be closed cautiously to prevent damage to the molecular sieve in the bed due to pressure fluctuations; need to start the two expanders should be fully open booster reflux valve, the pressure of the first operating expander down, and then the two expander at the same time to load, to prevent the start of the booster after the occurrence of wheezing; pay attention to the control of the middle temperature of the heat exchanger; pay attention to the air-cooled tower to ensure that the work of the pre-cooled air to meet the design requirements. Pay attention to the work of air cooling tower to ensure that the pre-cooled air meets the design requirements.
DEAR Air Separation has rich technology and experience in design, manufacture and development of air separation equipment.
There are standardised design requirements and technical documents in all aspects of the equipment to ensure high quality and safe operation.

DEAR Air Separation Solve YourAir separation equipment molecular sieve purification in which aspects should be noted?You can also learn about otherBiogas purification FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the working principles and processes of an air separation plant purification system?
2024.09.19
The forced valve is opened and closed by the air source pressure pushing the piston. Its faults include the faults in the cylinder and the valve body. The faults in the cylinder are mainly caused by the slow switching action, the valve is not easy to open or close badly. This is caused by low gas source pressure, dirty gas source or excessive pipeline resistance. It is also possible that the piston ring is worn and the amount of lubricating oil is too small, which causes air leakage of the piston. When the sealing packing is too tight, it will also cause the phenomenon of slow movement. In order to prevent air leakage, in addition to checking whether the seal is in good condition frequently during overhaul, you should also pay attention to keeping enough lubricating oil in the cylinder. Rust on the inner wall of the cylinder or foreign matters entering may also cause the phenomenon of jam, causing the forced valve not to move. The main failure in the valve body is the phenomenon tha...
2024.09.18
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top