当前位置: Home / Faq / Air separation parts FAQ /

What are the reasons why the rated power and pressure of the low-temperature liquid pump in the air separation equipment cannot be reached, and how to deal with them?

What are the reasons why the rated power and pressure of the low-temperature liquid pump in the air separation equipment cannot be reached, and how to deal with them?
Feb 26, 2024
Author: DEAR AST

The reasons why the rated power and pressure of the low-temperature liquid pump cannot be reached are as follows:

1. Cavitation or binding of the pump;

2. Impeller or volute blockage;

3. The heating before starting the pump is not qualified, and there is moisture inside the pump;

4. Damaged sealing ring and impeller;

5. The pressure after discharging the system is higher than the rated value.

Solution:

1. Improve inlet conditions, clean inlet filters, and ensure complete exhaust;

2. Clean up the blocked parts;

3. Remove moisture from dry and heated gas;

4. Replace the damaged parts;

5. Check the characteristic curves of the pump and discharge system, and improve the system pipelines.

The production technology of DEAR air separation equipment is mature and standardized, with strict technical control, and the equipment is safe and high-quality,

Ensure production safety, operation and maintenance, stable and efficient operation.

DEAR Air Separation Solve YourWhat are the reasons why the rated power and pressure of the low-temperature liquid pump in the air separation equipment cannot be reached, and how to deal with them?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts