Ensure that the cylinder is depressurized before starting the air compressor

Ensure that the cylinder is depressurized before starting the air compressor
Jul 21, 2022
Author: DEAR AST

In order to reduce the starting time and starting current, no-load starting is generally required before air compressor starting. Because from the starting characteristics of the motor driving the air compressor, it can be seen that the current when the motor starts is several times larger than that during normal operation, and the strong starting current has a great impact on the motor itself, the transformer and the transmission line. Due to the requirement of starting the motor, the pressure of pressure gauges at all levels should be checked before starting the air compressor. If there is gas storage, it should be deflated and depressurized.

The project developed by DEAR AI Intelligent Numerical Control Research Institute will establish four advantages in the air separation industry after its complete implementation: 1. Ensure safety, the extreme accuracy of the production end, eliminate potential safety hazards from the root, and the intelligent control of the operation end, actively warn and regulate risk factors in the process; 2. Improve production efficiency, fine production and intelligent operation, and reduce the internal resistance of equipment operation; Adjust and control to the optimal data to improve production efficiency by 5% - 10%; 3. Establish industry standards, quality rating standards at the production end, and intelligent management standards at the operation end; 4. Save 20% of electricity cost, 95% of labor cost and 30% of equipment service life.

DEAR Air Separation Solve YourEnsure that the cylinder is depressurized before starting the air compressorYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. Workers must wear safety helmets properly when entering the construction site, because the construction site is often chaotic. Some equipment installation sites, several construction teams are working at the same time, it is impossible to completely guarantee that there are no falling objects.2. Proper use of personal protective equipment, and carefully implement safety protection measures. When working on high places, cliffs and steep slopes without protective facilities, safety belts must b...
2024.05.16
The skid mounting of equipment refers to connecting the pipelines, equipment, pumps, control cabinets, electrical instruments and other components of the complete set into a whole according to the designed process flow, and fixing them on an integral base through welding, bolting and other connection methods. Without site installation, it can be directly completed the mechanical and electrical integration installation of the whole set in the plant area, then transporting and hoisting will be convenient.
2024.05.15
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top