Daily management of circulating water system in large air separation units

Daily management of circulating water system in large air separation units
Apr 11, 2022
Author: DEAR AST

1.Operators should adjust the discharge volume in time so that the concentration times are within the index.

2.Every week, a large amount of sewage should be discharged once. Discharge the sewage from the drainage pipe at the bottom of the tower.

3.Regularly analyse the calcium loss rate. Calcium loss rate is used to assess the system scaling situation, in general, calcium loss rate ≤ 20%.

4.Monitor the cooling water analysis once a week. Main analysis items: pH, conductivity, total phosphorus, total iron, total hardness, total alkalinity, etc. Record the daily dosing, water replenishment, drainage and chemical analysis.

5.Control index water treatment standards (international): carbon steel corrosion rate ≤ 0.125mm/a: copper corrosion rate ≤ 0.005mm/a: fouling thermal resistance ≤ 1 × 10K/W. Process control index: pH ≤ 9.2: turbidity ≤ 15.0mg/L; conductivity ≤ 2000μs/cm; total iron ≤ 1.0mg; total phosphorus ≥ 6.0mg/er: calcium loss rate ≤ 20% .

Dear Air Separation always takes science and technology as the guide, and the company has 3 research centres under the design and research institute. The company has 26 senior technical titles, 70 intermediate technical titles, and a group of highly sophisticated technical research and development talents such as doctors and masters, etc. The company has a number of design experts who enjoy a reputation in the same industry in China to ensure the technical advancement of small  air separation units, large air separation units and liquid air separation plants.

 

.

梅花项目2

DEAR Air Separation Solve YourDaily management of circulating water system in large air separation unitsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
1. The removal of perlite site shall be supervised by full-time personnel and guided by professionals. The principle of who organizes, who takes responsibility shall be followed. There should be a safe passage and a warning line at the removal of perlite site, and it is strictly forbidden to enter. 2. Dry air shall be used to warm the sand during the removal and knock the cold box to remove the pearlite caking, so as to prevent equipment damage caused by falling caking. 3. The removal of perlite should be carried out in layers and sand holes should be opened at different heights of the cold box. (It can be adjusted according to the site conditions) 4. In the process of removal of perlite, always supervise the caking on the top and enter the cold box for cleaning at any time. 5. In case of severe weather such as rain, snow, strong wind or sand storm danger, the construction party and the owner shall jointly confirm that the sand stripping work shall be postponed. 6. Remov
2025.04.18
How to check if the cooling water circulation of the air separation equipment is fully connected?
2025.04.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top