Small air separation unit circulating cooling water common problems judgment and treatment

Small air separation unit circulating cooling water common problems judgment and treatment
Apr 07, 2022
Author: DEAR AST

(A) air cooling tower spray head cold scale

  1. To determine whether the low-temperature water spray head scaling: check the recent 3 to 6 months of low-temperature cooling water spray flow and valve opening: if the spray flow has not changed, but the valve opening gradually rise (such as from 50% gradually up to 80%), it means that the low-temperature water in the gradual formation of low-temperature scale, while the air-cooled tower spray head also has obvious blockage. If the valve opening is fixed, but the spray flow is significantly reduced (such as from 60m / h down to 40m / h), that also means that the spray head has been significantly blocked
  2. In the case of no serious blockage of the shower head (not affecting the production of air separation equipment), first reduce the concentration of the circulating water, and the calcium hardness of the low-temperature water control within 300mg, alkalinity in 300mg below, PH control in 8.5 below, total phosphorus control in 5mg/1 below. Then to the low-temperature water cycle to add low-temperature scale inhibitor, by adjusting the spray flow (sometimes large and sometimes small), the spray nozzle slowly and gradually unclogging (longer cycle, 2 ~ 3 months):.
  3. If the shower head has been severely blocked (has affected the production of air separation equipment), in the case of shutdown, open the manhole at the top of the air cooling tower, with a good oxygen mask (closed space), send someone to dismantle all the spray pipes and remove the cold scale by physical methods (knocking, through the bubble).

The Dear Air separation O&M management team followed the guidelines for circulating water treatment to ensure safe operation of the small air separation units and large air separation units, liquid air separation plants.

山东临沂钢铁集团(三德)-16000

DEAR Air Separation Solve YourSmall air separation unit circulating cooling water common problems judgment and treatmentYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Why do the design, installation, and production of complete sets of air separation equipment require various parameters from the demand side?
2024.11.14
The classical single column process is the first one to be used in industrial application. However, there are many disadvantages in the classical single column process. One is that oxygen and nitrogen cannot be produced simultaneously, and the other is that the oxygen extraction rate can only reach about 70%. There are two improvement schemes to solve the defects of classical single column process. One is the curren...
2024.11.13
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top