Design basis for circulating water in large air separation units

Design basis for circulating water in large air separation units
Apr 06, 2022
Author: DEAR AST

According to the system water balance, water treatment to ensure that the circulating water system does not corrode and scale.

Water treatment operation steps: flushing the system with clean water is to remove mechanical impurities and suspended matter from the system. When the water system is full of water, then turn on the pump to run. When the turbidity of the circulating cooling water system is high, drainage replacement is carried out. When the turbidity is below 20mg, then move on to the next step.

Cleaning the pre-film in large air separation units: when putting medicine in the cooling tower it is forbidden to remove the water from the cooling tower. Drain again after 24 hours of continuous operation and refill with fresh water. The purpose of this step is to remove oil from the system and to purify the metal surfaces of the water cooling tower of the large air separation units. The next cleaning stage prohibits the drainage of water, which is then drained after 72 hours of continuous operation and replenished with clean water. The purpose of this step is to form a protective film on the metal surface to prevent corrosion of the metal.

The unattended system developed by Dear Air Separation allows operation and maintenance personnel to monitor and record data on site from thousands of miles away and to optimise in real time for more accurate and rapid regulation of small air separation units,bigair separation units and liquid air separation plants.11

DEAR Air Separation Solve YourDesign basis for circulating water in large air separation unitsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top