当前位置: Home / Faq / Large air separation FAQ /

Design basis for circulating water in large air separation units

Design basis for circulating water in large air separation units
Apr 06, 2022
Author: DEAR AST

According to the system water balance, water treatment to ensure that the circulating water system does not corrode and scale.

Water treatment operation steps: flushing the system with clean water is to remove mechanical impurities and suspended matter from the system. When the water system is full of water, then turn on the pump to run. When the turbidity of the circulating cooling water system is high, drainage replacement is carried out. When the turbidity is below 20mg, then move on to the next step.

Cleaning the pre-film in large air separation units: when putting medicine in the cooling tower it is forbidden to remove the water from the cooling tower. Drain again after 24 hours of continuous operation and refill with fresh water. The purpose of this step is to remove oil from the system and to purify the metal surfaces of the water cooling tower of the large air separation units. The next cleaning stage prohibits the drainage of water, which is then drained after 72 hours of continuous operation and replenished with clean water. The purpose of this step is to form a protective film on the metal surface to prevent corrosion of the metal.

The unattended system developed by Dear Air Separation allows operation and maintenance personnel to monitor and record data on site from thousands of miles away and to optimise in real time for more accurate and rapid regulation of small air separation units,bigair separation units and liquid air separation plants.11

DEAR Air Separation Solve YourDesign basis for circulating water in large air separation unitsYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Air cooling column start-up process
2026.07.10
What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?   High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas ...
2026.07.09
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top