The filling of the adiabatic material of the small air separation unit

The filling of the adiabatic material of the small air separation unit
Mar 10, 2022
Author: DEAR AST
  1. Before filling with pearlescent sand. Seal all the holes. The flanges inside the cold box are tied with glass fibre tapes and all temperature measuring lines and temperature-sensitive components in the cold box have good performance.
  2. It is strictly forbidden to build permanent scaffolding in the cold box, and it is strictly forbidden to use flammable and explosive materials to make permanent supports in the cold box. And should be completely removed from the cold box all temporary facilities and flammable and explosive materials.
  3. with adiabatic sleeve cold valve, after the end of the cold test, shall be filled with slag wool.
  4. cold butterfly valve without adiabatic casing, in the compensator filled with slag wool, near the cold box wall about 30m a section, with slag wool felt wrapped on several layers, outside with fasteners fastened on.
  5. measuring pipeline leading out of the cold box at the inner wall, the application of 2mm thin steel plate made of protective cover, in the protective cover filled with slag wool.
  6. The following parts and each compartment box. All must be filled with slag wool

(1) switch-type process, where the hot end of the plate heat exchanger exposed, the bottom plate shall be uniformly filled with 200 a 300mm slag cotton. In order to avoid vibration caused by switching, do not make the pearl sand leakage outside.

(2) liquid air, liquid oxygen adsorber silica gel filling and discharge compartment.

(3) Automatic valve box manhole cover compartment.

(4) Turbine expander filter maintenance compartment and its snail shell nearby.

(5) Circulating liquid oxygen pump maintenance compartment and filter compartment, etc.

(7) The water on the foundation of small air separation unit shall be removed and dried with hot air before filling with pearl sand.

(8) The pearl sand should be filled to the top of the small air separation unit cold box and no space should be left. In order to prevent the whole bag of pearlescent sand from falling into the cold box and damaging the small pipes inside the box, at the same time, for the sake of safety. A thick grid should be added at the entrance of the top of the cold box or a pearl sand pouring device should be installed.

  1. When filling the pearl sand, each container (including tower) and pipeline in the cold box are inflated. And keep 50kPa pressure, then slightly open the valve of each meter, each thermometer should be energized to check whether the thermometer cable is damaged during the filling process.
  2. The filled pearlescent sand is not allowed to be mixed with combustible materials.
  3. After filling, the entrance should be sealed (with manhole cover)
  4. Check the pearl sand vibrating situation after 10 days of driving, and make up the filling in time. Make the pearl sand in the cold box is always in full solid state.

秦皇岛安丰钢铁有限公司-KDON(Ar)-3000070000-900型空分设备

DEAR Air Separation Solve YourThe filling of the adiabatic material of the small air separation unitYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
How many adsorbers are there in the purification system of air separation equipment?
2024.04.30
At the installation site of the air separation plant, we may see a variety of operation methods. We may be a little surprised when we first see it. We may get used to it if we see it many times. However, many accidents are caused by our negligence and carelessness. The following are some common sense of safe construction, hoping to be helpful to everyone: 1. Workers must wear safety helmets correctly when entering the construction site, because the construction site is often chaotic. Some equipment installation site, several construction teams are constructing at the same time, it is impossible to completely guarantee that there is no falling objects. 2. Use personal protective equipment correctly, and seriously implement safety protection measures. Safety belts must be fastened when constructing on high places, cliffs and steep slopes without protective facilities. 3. It is forbidden to climb the scaffold, safety protection facilities, etc. It is strictly prohibited to take the ele...
2024.04.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top