Liquid air separation plant traditional process

Liquid air separation plant traditional process
Nov 26, 2025
Author: DEAR AST

The nitrogen from the top of the upper tower is piped through the nitrogen gas pipeline, reheated through the main heat exchanger of the colder tower, and a portion of the nitrogen is pumped out, then combined with the first pipeline and a portion of the nitrogen vaporised in the liquefier in the third pipeline before going to the main vessel. The first raw material air pipeline is heated up and out of the cold box in liquid air separation plant, then goes to the high pressure heat exchanger of the cold box, the pipeline containing LNG is cooled to about 123°C and pumped out and sent to the low pressure nitrogen press, another part of the nitrogen vaporised in the liquefier is heated up to about 123°C through the fourth pipeline by the high pressure heat exchanger and pumped out and sent to the low pressure nitrogen press, the gas separated by the first gas-liquid separation is also heated up to about 103°C through the seventh pipeline by the high pressure heat exchanger and sent to the low pressure nitrogen press. 03 ℃, pumped out, sent to the low-pressure nitrogen press, after the low-pressure cycle nitrogen pressure booster returned to the high-pressure heat exchanger cooling, again cold that is to a 123 ℃ or so out of the medium-pressure cycle nitrogen press.

Dear Air manufactures and produces circulating nitrogen compressors of liquid air separation plant.山东钢铁集团(壶井)16000

DEAR Air Separation Solve YourLiquid air separation plant traditional processYou can also learn about otherLiquefied air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The non-power consuming option for liquid air separation plants can be used for full liquid air separation plants,where the produced liquid is sold off. This approach is currently available for most LNG receiving stations. For air separation units with a large cold capacity, the liquid air can be pressurised to 6baA in a vacuum storage tank, and then heat exchanged through a heat exchanger, instead of the air compressor, directly into the cold box for distillation. At the same time in the cold b...
2026.03.13
1. Before connecting the pipe orifice of each container, clean white cloth shall be used to tie the orifice to prevent grease and dirt from entering. 2. When welding in the cold box and in the condensing evaporator, it is strictly forbidden for flame or arc to touch the surface of vessels and pipes. 3. The containers, valves, pipes and corresponding supports in the cold box, the surface of the cold box and the foundation surface shall not be stained with grease after installation, otherwise, degreasing treatment shall be carried out.
2026.03.12
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top