Pressure testing ofsmall air separation unit and piping systems requires pressure testing in different sections, divided into two sections: inside the cold box and outside the cold box.

 

Pressure test of the internal piping of the cold box: the system is tested by air pressure and the medium is dry, oil-free air. The test must be carried out by a dedicated partition responsible for strictly and carefully checking the leakage of each part, no leakage is allowed. The test pressure, stopping time and residual rate of each system are specified according to certain requirements. The pressure filling procedure is divided into two steps:

1, the first pressure filling to 20kPa, check the weld flange and other removable connections have no obvious leakage, if there is a leak, then release the pressure to fill the leak or tighten the removable parts;

2, after the above processing and then pressure filling to 50kPa and then carefully checked. If there is still leakage, the pressure should also be released to deal with it; then increase the pressure to 50 kPa. when there is no leakage, gradually increase the pressure to the test pressure specified in Table 3 -12.

 

The test must be carried out strictly in accordance with the division of labour in the pipeline to check for leaks. Leak detection can be carried out with non-fat soapy water or dibutyl sodium caisulphate solution as a foaming agent (as it has a corrosive effect on aluminium, it should be scrubbed clean with clean hot water after the leak test). Leaks in welds must be repaired correctly. Repair by tapping or by using a preservative (low temperature adhesive) is never allowed. The repair weld is then checked with 50kPa pressure.

 

Pressure test of the external piping of the cold box: except for the pressure test of the water system which can be carried out with water, the rest of the system is carried out according to the above requirements.

 

After the pressure test, the blind plate for the test pressure is removed and a new gasket is fitted to tighten the bolts and nuts. After removing the blind plate, another gas tightness test is required, with the test pressure being the working pressure.

 

Dear Air Separation carries out pressure tests on small air separation unit and piping systems, according to its own technical requirements, and follows the relevant pressure test procedures to ensure the quality.

IMG_20151217_100216

DEAR Air Separation Solve YourHow to test the piping systems pressure of small air separation unit?  You can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What precautions should be taken when designing a complete set of air separation equipment?
2024.11.22
In case of sudden power failure during the operation of small air separation unit, the following steps should be followed:   First, open the vent valve (anti surge valve) of air compressor to prevent the air compressor from surging and causing the air compressor to reverse due to air backflow;   Then check whether the molecular sieve adsorber switch should be interlocked to close, if not, it should be man...
2024.11.21
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top