Pipeline installation in air separation column

Pipeline installation in air separation column
Mar 22, 2021
Author: DEAR AST

If the air separation column is installed at normal temperature and works at low temperature, if the prestress is too large or the cold compensation is not good, it is easy to cause pipe cracking and valve sticking. In order to avoid this kind of problem, the installation should be done: when piping, it is generally large first and then small, difficult first and then easy, small pipe let big pipe, heat pipe let cold pipe; when the welding joint of valve and pipeline is too large, do not force installation; for the welding joint of flange connecting with valve and vessel, do not add gasket before welding, tighten the flange bolt, and then add gasket after welding; change the valve hanger into rigid support Avoid using small pipe and stem as scaffold.

DEAR Air Separation Solve YourPipeline installation in air separation columnYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Pressure swing adsorption and temperature swing adsorption of molecular sieve
2024.12.19
What is the function of the distillation tower in air separation equipment?
2024.12.18
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top