Question Reply

When the new air separation plant is purged the first time, the air compressor pressure shall be increased to the quota pressure as far as possible. The purge valve should be fully opened as far as possible. Since the drain valve is connected together, the pressure is different. Therefore, when purging the drain valve, should purge one by one, and then close one after another for half an hour. After purging, do not fully close the purge and drain valves. Shut down the air compressor and wait until there is no pressure. Take all the valve bodies of the purge and discharge valves to check and clean, and then restore them. Only in this way can the purging be qualified.

DEAR Air Separation Solve YourPrecautions for purging of new air separation plantYou can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for the design of piping in the cold box of liquid air separation plant? The design of piping in the cold box ofiquid air separation plant is complex and troublesome, and each pipeline has its own process requirements. As one of the most complex components in the cold box of air separation equipment, low temperature piping is the key to ensure the stable and safe operation of small air separation unit. A set of air separation equipment in the cold / hot end of the plat...
2025.05.15
1. Before hoisting, check and confirm whether the crane body, crane legs, lifting rigging and wire rope meet the safety requirements and hoisting conditions. 2. The hanging points of hoisting facilities shall be confirmed to prevent deviation and inclination; steel wire rope or sling shall be used for protection of edges and corners; sling and U-ring shall be used for lifting objects. 3. The commander shall use inter-phone for command, and special personnel shall be assigned for command, and the personnel shall stand at the position where the lifting object can be fully observed; warning isolation shall be set up in the hoisting area, and no one shall stand under the lifting object. 4. For large-scale hoisting, the hoisting safety scheme shall be formulated in combination with the company's special operation system.
2025.05.14
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top