Why the low temperature valve is easy to get stuck and cannot pull. How to solve it?

Why the low temperature valve is easy to get stuck and cannot pull. How to solve it?
Dec 12, 2023
Author: DEAR AST
Question Reply

Low temperatureValveInstall at normal temperature and work at low temperature, with a wide range of temperature variation. If the design and installation are not appropriate, it is easy to generate thermal stress or deformation. Meanwhile, the operation part of the valve is at normal temperature, and the circulation part is at low temperature. In order to reduce the cold loss, the stem is often made very long, which is easy to produce deformation and get stuck.
Low temperature valve often rotates flexibly at normal temperature, but it is tight at low temperature, even can't be opened. The main reasons why the valve gets stuck at low temperature are:
1) during installation, prestress is generated due to unreasonable configuration of the valve and the pipeline; or the cold compensation ability of the pipeline is poor, and the valve position changes at low temperature; or the valve lacks support, and deformation is generated at low temperature; or the valve is not fixed properly, and the cold box will deform at low temperature, which will affect the concentricity between the valve stem and the valve body.
2) in terms of design, because the material of the valve stem and the valve sleeve are different, the linear expansion coefficient is different. Generally, the stem is made of stainless steel, and the coefficient of linear expansion is 1.73 × 10-6-1; The valve sleeve is brass, and the linear expansion coefficient is 19.9 × 10-6-1, That is, the shrinkage of brass is larger than that of stainless steel, which may bite the silk buckle at low temperature. Especially when adopting the hidden rod structure and fine-tooth thread, the temperature variation range of the screw thread is large, and the gap between the screw thread is small, which is more likely to cause the phenomenon of biting.
3) in operation, due to the incomplete heating of the valve, orValveWater enters into the stuffing, which will freeze at low temperature, or close the valve too tightly at normal temperature to bite the screw button, etc.
In order to prevent the phenomenon that the valve gets stuck, the design should adopt open-bar structure and thick-tooth trapezoid thread; there should be a firm bracket at the valve to preventValvePull and bend the valve stem along with the displacement of the pipeline.ValveThe fixation of the cold box can adopt elastic connection to prevent the valve stem from deformation and being different from the valve body; during the period of naked cooling, check and adjust the installation condition of the valve under cold condition, when it is found that the valve gets stuck after cooling down, the fixed flange of the valve on the barrel shell can be adjusted to make it switch freely.
During the operation, the heating before starting should be thorough. When closing the valve, the principle is no air leakage, and do not use too much strength.

DEAR Air Separation Solve YourWhy the low temperature valve is easy to get stuck and cannot pull. How to solve it?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top