当前位置: Home / Faq / Air separation parts FAQ /

Knowledge about stress dew point

Knowledge about stress dew point
Oct 23, 2023
Author: DEAR AST
Question Reply

Pressure dew point: after the wet air is compressed, the density of water vapor increases and the temperature also rises. When the compressed air cools down, the relative humidity will increase. When the temperature continues to drop to 100%, water drops will come out from the compressed air, the temperature at this time is the "pressure dew point" of compressed air ".

The relationship between pressure dew point and normal pressure dew point

The corresponding relationship between the pressure dew point and the normal pressure dew point is related to the "compression ratio", which is generally expressed by charts. Under the condition of the same "pressure dew point", the higher the "compression ratio" is, the lower the normal pressure dew point it corresponds to IS. For example: when the compressed air pressure dew point of O.7MPa is 2℃, the normal pressure dew point is-23℃. When the pressure increases to 1.0MPa and the dew point of the same pressure is 2℃, the corresponding normal pressure dew point drops to-28℃

Pressure dew point measurement

Although the unit of pressure dew point is ℃, its connotation is the water content of compressed air. Therefore, measuring the dew point is actually measuring the moisture content of the air. There are many instruments for measuring compressed air dew point, such as mirror dew point meter, electric sensor Dew Point meter, dielectric method Dew Point meter, Crystal oscillating Dew Point meter, infrared Dew Point meter, semiconductor sensor Dew Point meter, such as MICHELL Dew Point meter in Britain, the measuring range of this instrument can reach-100℃.

Precautions for measuring pressure dew point 

Use the dew point meter to measure the air dew point, especially when the water content of the tested air is very low, the operation should be very careful and patient. Gas SamplingAir separation equipmentAnd connection pipeline must be dry (at least more dry than the measured gas), pipeline connection should be completely sealed, gas flow rate should be selected according to the provisions, moreover, a long enough pretreatment time is required. A little carelessness will lead to a large error. It is proved that there is a big error when measuring the "pressure dew point" of the compressed air processed by the cold dryer by using the "micro-moisture analyzer" using phosphorus pentoxide as electrolyte. According to the manufacturer's explanation, this is because the compressed air will produce "secondary electrolysis" during the test process, which makes the read value higher than the actual value.

DEAR Air Separation Solve YourKnowledge about stress dew pointYou can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top