What conditions limit the inflated air volume entering the tower?

What conditions limit the inflated air volume entering the tower?
Apr 22, 2024
Author: DEAR AST
Question Reply

The expansion air volume entering the upper tower increases, and the reflux ratio of the distillation section decreases correspondingly. In order to achieve the required purity of nitrogen products, more tower plates need to be set. When the reflux ratio is reduced to countless Tower plates needed to be set to make the purity of nitrogen reach the required value, then the reflux ratio is called the minimum reflux ratio. The expansion air volume entering the upper tower is first limited by the minimum reflux ratio. The closer the reflux ratio is to the minimum reflux ratio, the faster the number of tower plates needed to ensure the product purity increases, which will lead to the increase of investment, the increase of tower plate resistance, the increase of Operation pressure and the increase of energy consumption. Therefore, the reflux ratio after the inflated air enters the tower should be larger than the minimum reflux ratio.


When the purity of nitrogen is required to be low, the minimum reflux ratio will also decrease, and the expansion air volume allowed to enter the upper tower will be more, then the extraction rate of oxygen will accordingly decrease. In addition, if the purity of liquid space is high, the amount of liquid space will be less, and the corresponding amount of liquid nitrogen will increase. This will increase the reflux ratio of the distillation section and allow the expansion air volume to be sent into the upper tower to increase appropriately. The purity of oxygen is lower, and the amount of inflated air that is allowed to be delivered can be larger. In a word, the inflated air volume sent to the upper tower should comprehensively consider the influence of factors such as reflux ratio, Tower plate number, oxygen, nitrogen and liquid-air purity, so as to ensure the product purity and not to reduce the oxygen extraction rate too much, under the condition of not increasing the number of tower plates and energy consumption too much, send proper amount of air expansion. At present, generally, the expansion air volume allowed to be sent to the upper tower is 0.15 ~ 0.25 processing air volume. For large scaleAir separation equipment, The cold loss is small. The inflated air needed to make up for the cold loss will not exceed the above requirements, so all the inflated air can be sent to the upper tower. For small and medium-sizedAir separation equipment, The cold damage is relatively large. If the expansion volume is greater than the above requirements, if all the expansion air is sent to the upper tower, the number of tower plates will increase too much, and the energy consumption will also increase significantly at the same time. When designing, we would rather only send part of the air to the upper tower, and the other part of the air will pass through to the heat exchanger and only recover its cooling capacity, which is more economical and reasonable.

DEAR Air Separation Solve YourWhat conditions limit the inflated air volume entering the tower?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The comprehensive energy-saving transformation of cryogenic air separation is not a single point of equipment replacement, but a collaborative optimization of the whole system, which mainly covers six technical sectors: 1. optimization of compressed air supply system: frequency conversion/permanent magnet transformation of air compressor, matching of air supply pressure, reducing the loss of venting and depressurization, solving the problem of "big horse pulling small car", and the compression link accounts for more than 70% of the total energy consumption of air separation, which is the focus of energy conservation; 2. transformation of precooling and purification system: high efficiency and low resistance molecular sieve, adaptive regeneration control, air inlet precooling, reduce regeneration energy consumption and system resistance, and reduce compressor load; 3. upgrading of rectification and main heat exchange system: efficient and regular packing, optimization of reflux ratio, o
2026.11.20
Answer:>>the conventional air separation unit of DEAR air separation plant is designed for 20 years, which meets the design service life recommended by national standards and specifications, and is also the cost-effective optimization scheme for bot/boo gas investment and long-term stable gas consumption projects. The default recommended design service life of the national standard and relevant specifications, feasibility study, bidding and preliminary design drawings of pressure vessels is 20 years. Designed for 20 years: the cold box plate, heat exchanger and pressure bearing parts are of higher material selection grade, suitable for long-term continuous operation, and suitable for bot/boo gas investment, metallurgy and chemical industry long-term gas supply projects; The maintenance is in place and the technical transformation is timely. The actual stable service can reach 20-25 years, and the working condition management can reach 28-30 years. 15 years of design: moderate investmen
2026.11.20
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top