Home / All Air Separation tags / Recruitment of DEAR air separation /

Recruitment of DEAR air separation news

On the afternoon of July 6, 2012, 14th new employee induction trainings organized by the company's human resources department were held as scheduled. ...

2012.07.06

After entering the summer solstice, each production workshop ushered in the production peak again. The KDON (Ar)-1500 40Y/1500/40Y air separation set ...

2012.07.05

The spacing between the tower plates determines the height of the whole distillation column. Therefore, it is hoped that the spacing between the tower...

2012.07.05

The theoretical displacement of screw compressor depends on the volume between teeth, the number of teeth and the rotating speed. The volume between t...

2012.06.29

The pressure value measured by the pressure gauge reflects the pressure level, but it is not the actual pressure. According to the working principle o...

2012.06.29

All the staff of the company highly establish quality awareness and further strengthen product quality and quality management. Emphasize strict qualit...

2012.06.26

Through the joint efforts of all the staff of the company, the KDON-12000/15000 air separation plant designed, manufactured and installed by our compa...

2012.06.25

It is said that there is a kind of bird called cold bird. This kind of bird is different from all kinds of birds. It has four feet and two bare flesh ...

2012.06.21

The year of June 2012 is 11th national "safety production months" jointly advocated and organized by seven ministries and commissions ". The theme of ...

2012.06.09

For the old and new pressure gauge, its precision should be verified. Special pressure gauge calibrator should be used during verification. Generally,...

2012.06.08

1. When there is no pressure on the pressure gauge with limited stop nail, the pointer can not return to the stop nail after rotating. When there is n...

2012.06.05

1. For boilers whose working pressure is less than 2.5MPa, the precision of pressure gauge should not be lower than grade 2.5; for boilers whose worki...

2012.06.01
1...56 57 58 59 60 61 62 63...97
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top