The installation of air separation unit is generally divided into machine installation, unit installation, valve and pipeline installation, electric control system installation, instrument control system installation and auxiliary system installation according to the process and function. After the installation of the air separation unit is completed and passed the inspection, the single unit test run and linkage test run can be carried out.