Home / All Air Separation tags /

Biomass energy equipment

Biomass energy equipment
With the rapid development of global economy, the problems of energy and environmental protection are increasingly prominent. Developing and generating renewable energy is an effective way to solve the energy shortage in the future. Biogas purification equipment is a common biomass energy equipment, which can separate the complex components of biogas to a certain extent according to the actual needs. Biomass energy equipment needs to meet the needs of technology, environment, safety and economy.
Albums of Biomass energy equipment
More
Solutions of Biomass energy equipment
More
Small air separation plant KDON (Ar)-4000/4000-110 solution for metallurgical industry
Metallurgical industry is an industry that exploits metal mineral resources and produces raw materials of various metal products, which is closely related to the national economy and people's livelihood. At present, Chinese iron and steel industry still has the situation of low concentration, insufficient capacity of high-end products and serious surplus of low-end products. DEAR air separation has provided a number of complete solutions for the metallurgical industry for many years, accumulated rich experience and helped the efficient development of the metallurgical industry. With years of service experience in the metallurgical industry, the small air separation plant KDON (Ar) - 4000 / 4000-110 cooperated by DEAR air separation and customers provides air separation plant with mature technology, stable equipment working condition, excellent performance and energy saving intelligence, which is highly recognized by customers.
Large complete air separation plant KDON(Ar)- 30000/70000-900 solution for chemical industry
DEAR air separation has provided many sets of air separation plant for chemical industry for many years, with rich experience and the safe and stable unit operation. This unit adopts molecular sieve purification, booster turbine expander to supply the cooling capacity of the unit, and the whole rectification hydrogen-free argon production process. The rapid growth of enterprises in the industry is accompanied by the demand for production and the demand for air separation plant. DEAR air separation has cooperated with customers in the large-scale complete set of air separation plant KDON (AR) - 36000/70000-1200 project, which provides customers air separation plant with mature technology, reliable and convenient operation, and energy saving intelligence, which improves the production efficiency of customers, saving the operation cost and creates greater economic benefits.
Faq of Biomass energy equipment
More
1) The station can only be built after the review and approval of relevant departments according to the regulations on the safety management of chemical dangerous materials and the regulations on the safety supervision of gas cylinders issued by the State Council; 2) filling station should go through the registration formalities of Boiler and Pressure Vessel Safety Supervision Agency of Labor Department, and can only be engaged in gas filling work after passing the on-site examination; 3) the production devices, buildings and safety facilities of the filling station must conform to the provisions of fire prevention, explosion prevention and environmental protection; 4) the filling station must establish a management system to ensure the quality and safety of the filling station, such as safety education, training, fire prevention and explosion prevention, storage and transportation, equipment maintenance and other systems, and have the relevant standards, specifications and other te...
Mar 18, 2024
The start-up of the air separation plant includes three stages: cooling, hydrops and purification. For a certain equipment, the start-up time is roughly certain. As for the low-pressure air separation equipment, there is no room to adjust the pressure of the air compressor. Generally, it depends on two expansion machines working at the same time to increase the refrigerating capacity in the start-up stage and shorten the start-up time. Even so, according to the maximum refrigeration capacity and the cooling required by cooling and Hydrops of the device, the start-up time of the device needs to be more than 36 hours. Large air separation plants are generally equipped with liquid oxygen storage tanks as emergency standby oxygen. If necessary, can liquid oxygen be filled into the tower to shorten the start-up time of the air separation plant? Theoretically, it is completely possible. For example, if filling 1M3 liquid oxygen into the main cooling, it is equivalent to providing 0.47 × 1...
Jan 19, 2024
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top