What are the requirements of the air separation equipment gas station for the surrounding air?

What are the requirements of the air separation equipment gas station for the surrounding air?
Dec 20, 2023
Author: DEAR AST

In order to ensure the safety of oxygen production, there are certain restrictions on the combustible impurities of hydrocarbons in the air at the suction port of the air compressor. According to GBl6912-1997 "Technical Safety Regulations for Oxygen and Related Gases", the impurity content should be lower than the allowable limit content specified in the table below.

The allowable limit content of hydrocarbons and other impurities in the air at the suction port

Names of impurities such as hydrocarbons

Permissible limit content (carbon content)/mg · m-3

There is a liquid air adsorption purification device inside the air separation tower

There is a molecular sieve adsorption purification device in front of the air separation tower

Acetylene

0.5

5

Acetylene derivatives

0.01

0.5

C5、C6saturated and unsaturated hydrocarbon impurities totaling

0.05

2

C3、C4saturated and unsaturated hydrocarbon impurities totaling

0.3

2

C2saturated and unsaturated hydrocarbon impurities total

10

10

Carbon sulfide(CS2)

Nitrogen oxide(NO)

Ozone(O3)

0.03

1.25

0.215

 

DEAR Air Separation Solve YourWhat are the requirements of the air separation equipment gas station for the surrounding air?You can also learn about otherAir separation parts FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The molecular sieve used in oxygen generators is the zeolite molecular sieve. It is a crystalline silica and aluminate polyhydric compound. Molecular sieves have a uniform pore size and their main function is to sieve molecules. There are three main types of molecular sieves: A, X and Y. The 13X molecular sieve is the only adsorbent currently used in liquid air separation plants. Any molecules that can be adsorbed on 3A, 4A and 5A molecular sieves can be adsorbed by 13X molecular sieves. It is c...
2026.09.30
Pressure test before valve installation 1. In the warranty period, those with the certification and the sealing surface is intact can no longer conduct the strength test alone, but only the air tightness test can be taken before installation. 2. Within the warranty period, it has the certificate, and its sealing surface has defects such as corrosion and damage. After treatment, it must carry out the air tightness test. 3. Outside the warranty period, those with certification and intact sealing surface shall be subject to air tightness test before installation. 4. For valves that need to be degreased and disassembled on site, air tightness test shall be conducted separately before installation. 5. The safety valve shall be sent to the local quality inspection department of the project for verification before the end of installation and commissioning.
2026.09.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top