Installation of small air separation unit valves

Installation of small air separation unit valves
Jan 21, 2022
Author: DEAR AST

1 pay attention to the direction of the arrow on the valve and the process requirements of the media flow direction, in order to avoid installation small air separation unit valves errors.

2 The pipeline connected with the valve should be thoroughly cleared of dirt, dust and other foreign mechanical impurities before installation. Prevent damage of the sealing surface of the valve.

3 The cold valve on the cold box of small air separation unit should be installed at the same time as the corresponding bracket, and the valve stem should be tilted at 15℃.

4 pipeline and body welding to close the valve first and use cooling measures, the body temperature in welding is not higher than 200 ℃, so as not to deform the valve seals, affecting the normal use of the valve.

5 switch valve installation, the shaft should be in a horizontal position, flange bolts should be evenly cross-tightened.

6 remote control valve after installation. Should strictly check whether the command signal and the valve actuator action is synchronized, whether the full open and full close position is correct, and record the opening degree command and the actual opening degree relationship of the valve.

7 after the installation of the valve opening and closing should be flexible, after the connection of the pipeline and the cold test process are to check the valve opening and closing state, there shall be no jamming phenomenon to be considered qualified. Where the cold angle valve with sleeve, low temperature pneumatic film adjustment valve, in the cold test process, need to use special tools to tighten the flange bolts.

山东传洋集团18000

DEAR Air Separation Solve YourInstallation of small air separation unit valvesYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
How many adsorbers are there in the purification system of air separation equipment?
2024.04.30
At the installation site of the air separation plant, we may see a variety of operation methods. We may be a little surprised when we first see it. We may get used to it if we see it many times. However, many accidents are caused by our negligence and carelessness. The following are some common sense of safe construction, hoping to be helpful to everyone: 1. Workers must wear safety helmets correctly when entering the construction site, because the construction site is often chaotic. Some equipment installation site, several construction teams are constructing at the same time, it is impossible to completely guarantee that there is no falling objects. 2. Use personal protective equipment correctly, and seriously implement safety protection measures. Safety belts must be fastened when constructing on high places, cliffs and steep slopes without protective facilities. 3. It is forbidden to climb the scaffold, safety protection facilities, etc. It is strictly prohibited to take the ele...
2024.04.29
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top