1 pay attention to the direction of the arrow on the valve and the process requirements of the media flow direction, in order to avoid installation small air separation unit valves errors.

2 The pipeline connected with the valve should be thoroughly cleared of dirt, dust and other foreign mechanical impurities before installation. Prevent damage of the sealing surface of the valve.

3 The cold valve on the cold box of small air separation unit should be installed at the same time as the corresponding bracket, and the valve stem should be tilted at 15℃.

4 pipeline and body welding to close the valve first and use cooling measures, the body temperature in welding is not higher than 200 ℃, so as not to deform the valve seals, affecting the normal use of the valve.

5 switch valve installation, the shaft should be in a horizontal position, flange bolts should be evenly cross-tightened.

6 remote control valve after installation. Should strictly check whether the command signal and the valve actuator action is synchronized, whether the full open and full close position is correct, and record the opening degree command and the actual opening degree relationship of the valve.

7 after the installation of the valve opening and closing should be flexible, after the connection of the pipeline and the cold test process are to check the valve opening and closing state, there shall be no jamming phenomenon to be considered qualified. Where the cold angle valve with sleeve, low temperature pneumatic film adjustment valve, in the cold test process, need to use special tools to tighten the flange bolts.

山东传洋集团18000

DEAR Air Separation Solve YourInstallation of small air separation unit valvesYou can also learn about otherSmall air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?   High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas ...
2026.07.09
Liquid air separation plant solutions Most liquid air separation plant cold energy receiving stations have a peaking role, their use is generally for domestic gas or car refuelling, with high and intermittent periods of gas consumption, for example 1-2 hour peaks in the morning and midnight. If the liquid air separation plant vapourisation plant is intermittent, the plant will not operate continuously. The solution is based on the intermittent use of liquid air separation plant and is character...
2026.07.08
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top