What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?

What are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?
Jun 07, 2023
Author: DEAR AST

High purity nitrogen gas has to be transported through pipelines to the point of use of the small air separation unit. In order to meet the quality requirements of the gas for the process, the selection of materials for the piping system and the quality of construction need to be paid more attention to during the construction process, provided that the gas export index is determined. The quality of the gas depends not only on the precision of the gas production or purification unit, but is also influenced to a large extent by many factors in the piping system. The piping of the high-purity nitrogen system requires the use of electrolytic polished (EP) low carbon (316L) stainless steel tubes with the same material as the bellows valves or diaphragm valves.

 

In the stainless steel melting process, approximately 200g of gas is absorbed per tonne of steel. After processing, stainless steel not only has various contaminants adhering to its surface, but also leaves a certain amount of gas in its metal lattice. When there is airflow through the pipeline, this part of the gas absorbed by the metal will re-enter the airflow and pollute the pure gas. When the airflow in the tube is discontinuous flow, the tube to the gas through the formation of pressure adsorption, the airflow stopped through, the tube adsorption of gas and the formation of pressure reduction analysis, and the analysis of the gas as impurities into the pure gas in the tube. The adsorption and resolution cycle makes the metal on the inner surface of the tube also produce a certain amount of powder, and this metal dust particles also contaminate the pure gas inside the tube. This characteristic of the tube in small air separation unit affects the purity of the gas conveyed, so the process requires not only an extremely smooth inner surface of the tube, but also a high degree of wear resistance.

 

Dear Air Separation refers to international industry standards in the selection of materials and piping, and adheres to the relevant industry principles in the selection of pipes, and indicates the material of the pipes in the drawings.

纯氮空分设备 (1)

DEAR Air Separation Solve YourWhat are the requirements for selecting materials for high purity nitrogen gas distribution pipelines in small air separation unit?You can also learn about otherHigh purity nitrogen air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
Liquid air separation plant cold energy utilises air separation equipment, generally large air separation equipment with 2 combined expanders. The price is around 4 million RMB. The expansion air in the air separation plant is no longer required, so for the internal compression process air separation, the inlet air volume of the circulating booster is reduced by about 40% (from 5.A-2A). The energy consumption of the booster is reduced and the investment is reduced. Liquid air separation equipmen...
2026.06.18
1.In the process of preparation and implementation of hoisting construction, the safety and quality assurance system must ensure the normal operation,to ensure that the hoisting project meets the requirements of safety and quality. Before hoisting, safety and quality inspection must be carried out, and it must comply with the code forLifting construction of chemical engineering construction (HG20201-2000) and other regulations and specifications. 2.The crane performance shall meet the requirements of hoisting process, and the alarm and hydraulic system must be reliable. 3.Strictly implement the provisions of the technical documents attached to the crane. 4.The hoisting schedule of auxiliary crane should match that of main crane. 5.The hook deflection angle shall not be greater than 3°. 6.It is forbidden to drag the unitdirectly on the ground with crane. 7.Before unithoisting, trial hoisting shall be carried out. The clear hoisting distance and the foundation change at
2026.06.17
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top