How to degrease the pipeline and equipment of DEAR Cryogenic air separation unit?

How to degrease the pipeline and equipment of DEAR Cryogenic air separation unit?
Jul 27, 2021
Author: DEAR AST

DEAR Cryogenic air separation unit.When the liquid level of condensing evaporator is too high, part of liquid oxygen can be discharged. This can not only make the liquid level drop rapidly, but also remove some impurities, which is conducive to safe operation. If the equipment is equipped with argon tower, the liquid oxygen level should be raised in advance to accumulate cold capacity, and then the argon tower should be started.Where the liquid layer is thin, the resistance is small, the amount of steam rising from the small hole is more; where the liquid layer is thick, the resistance is large, the amount of steam passing through is less, or even No. The distillation process of air on the fractionator tray depends on the mass transfer and heat transfer between the rising steam and the liquid on the tray. The more the gas and liquid contact on the tray, the more perfect the distillation process will be, and the more conducive to the separation of oxygen and nitrogen.DEAR Cryogenic air separation unit.The problem can't be solved by screwing the bolt alone. The bolt is often screwed hard because the leakage is not eliminated until the bolt is broken and the high-pressure gas in the pipe is ejected, causing personal injury. Therefore, it is necessary to strictly abide by the provisions of not screwing bolts under pressure, and not to rush for time and tasks with fluke mentality and violate the operating procedures.
The heating water in the heating furnace should be replenished in time, and the pressure of each part should not be greater than the working pressure when blowing. In the process of high and medium pressure blowing, the body is not allowed to aim at the gas outlet. Wear gloves when checking for impurities in the gas. Pay attention to the volume of air and whether the sound is normal.The operating pressure of medium pressure oxygen pipe network is generally 1.8 ~ 3.0MPa. When a branch pipe or spherical tank needs to be repaired, it will inevitably encounter the situation of medium pressure oxygen release and opening. In order to ensure the safety of opening and closing the oxygen valve, it is required to control the pressure difference between the front and back of the oxygen valve with diameter less than 50 mm below 0.3 MPa.Because the density of the vapor-liquid mixture formed in the boiling process is relatively small, the longer the tube is, the better the condensation heat release is. Generally, when l > 1.2m, the flow of condensate film has become turbulent.
If the air is compressed to 0.6MPa and the temperature is still 30 ℃, the saturated moisture content in each cubic meter of air is still 30.3g/m3. However, when the pressure increases, the air quality contained in each cubic meter of air increases, and the moisture content increases accordingly. When the temperature is constant and the saturation content is constant, the excess water will precipitate in liquid state.When other conditions are the same, the larger the average temperature difference is, the greater the heat transfer is, and the better the heat transfer effect is. For the same amount of heat transfer, the required heat transfer area can be reduced. The temperature of the heat flow in the same section of the heat exchanger must be higher than that of the cold fluid. If the downstream arrangement is adopted, the final temperature of the hot fluid outlet should still be higher than that of the cold fluid outlet;After positioning the vessel and valve, prepare the pipeline according to the actual situation. Don't force to install when the welding joint of valve and pipeline is too large; according to the field experience, generally, each welding joint shrinks about 1.5mm after cooling. For this reason, according to the specific situation of the installation welding joint at the flange connecting with the valve and vessel, the flange bolts shall be tightened without gasket before welding, and then the gasket shall be added after welding, so as to reduce the bolt pre tightening force and pipeline stress.

DEAR Air Separation Solve YourHow to degrease the pipeline and equipment of DEAR Cryogenic air separation unit?You can also learn about otherAir separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
The liquefaction of gases can be divided into forward and reverse cycles. The forward cycle process is the absorption of heat from the higher temperature external heat source and the release of heat to the lower temperature external heat source. The reverse cycle is when the mass draws heat from a lower temperature external heat source and releases it to a higher temperature external heat source. The forward cycle converts heat energy into mechanical energy and the reverse cycle converts mechani...
2025.09.26
Distillation is using the different boiling points of the two substances to condense the mixed steam and vaporize the mixed liquid repeatedly to achieve gas separation. For a mixed liquid composed of two substances with different boiling points, when the heat absorption part evaporates, the volatile components will evaporate more, while the mixed steam will give off heat and partially condense, the non volatile components will condense more. If the saturated steam with higher temperature is mixed with the saturated liquid with lower temperature, the steam will release heat and partially condense, and the liquid will absorb heat part of it evaporates. If after a round of partial evaporation and partial condensation, the steam and liquid with higher concentration will contact with the steam and liquid with different temperature respectively, and then partial condensation and partial evaporation will occur again. This process will be repeated for many times, and finally gas separation
2025.09.25
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top