当前位置: Home / Faq / Large air separation FAQ /

What safety matters should be paid attention to when picking up and installing Pearl sand?

What safety matters should be paid attention to when picking up and installing Pearl sand?
May 26, 2023
Author: DEAR AST
Question Reply

At present,Air separation equipmentMost of the cold-keeping materials filled in the cold-keeping box are Pearl sand.
Pearl sand is a particle with small apparent density, which is easy to fly. It will invade the facial features, stimulate the throat and eyes, and even suck in the lung through the respiratory tract. Therefore, wear a protective mask when working.
The fluidity of Pearl sand is very good, and its density is smaller than that of water. People will be drowned and suffocated when they fall into the Pearl sand layer. Therefore, the manhole on the top of the cold box and the loading position should all be installed with 8 ~ 10mm steel bar welded square-shaped safety iron fence to prevent accidents.
When the Pearl sand needs to be removed, the leaking parts are found in the cold box. If it is oxygen leakage, it will increase the oxygen concentration in the cold box, and if it is fire overhaul, explosion accident may occur; if it is nitrogen leakage, the nitrogen concentration in the cold box is very high, which may cause suffocating accident. Therefore, before entering the cold box operation, be sure to analyze in advance whether the oxygen concentration in the cold box is within the normal range (19% ~ 21% ).
In addition, the Pearl sand in the cold box is in low temperature (-50 ~ -80℃), pay attention to take antifreezing measures when extracting Pearl sand. Meanwhile, pay attention to the low temperature Pearl sand in the air will condensation and become damp, which will affect the cooling performance of the next filling.

DEAR Air Separation Solve YourWhat safety matters should be paid attention to when picking up and installing Pearl sand?You can also learn about otherLarge air separation FAQ about DEAR Air Separation, and solve the problem for you.
Didn’t find the problem encountered?
Please contact live chat or email for quick help.
Related FAQ
More Related FAQ
What precautions should be taken when designing a complete set of air separation equipment?
2024.11.22
In case of sudden power failure during the operation of small air separation unit, the following steps should be followed:   First, open the vent valve (anti surge valve) of air compressor to prevent the air compressor from surging and causing the air compressor to reverse due to air backflow;   Then check whether the molecular sieve adsorber switch should be interlocked to close, if not, it should be man...
2024.11.21
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top