Home / All Air Separation tags /

Welding requirements for large air separation unit

Welding requirements for large air separation unit
Welding requirements in large air separation unit, pressurised critical welding process assessment in strict accordance with the standard, pressure equipment with the provisions of the welding process assessment, the number of impact tests shall not be less than 2 groups of welds and heat affected zone, each group of 3 specimens.
News of Welding requirements for large air separation unit
More
Dec 11, 2020
On December 7, 2020, Kaifeng DEAR air separation Industrial Co., Ltd. (hereinafter referred to as: DEAR air separation) and Shaangu Group once again j
Oct 14, 2020
On October 13, it was reported that Kaifeng DEAR air separation Industrial Co., Ltd. (hereinafter referred to as DEAR air separation) and Luoyang Zhon
Solutions of Welding requirements for large air separation unit
More
Type 8000/2000-240 solution for small and medium-sized air separation plant in circular economy industry
Circular economy is also characterized by resource conservation and recycling, which is a harmonious economic development mode with the environment. All materials and energy can be used reasonably and persistently in this continuous economic cycle, in order to reduce the impact of economic activities on the natural environment as small as possible. As an emerging industry, the market development in the future is inestimable.
2400/1000-type solution for small and medium-sized air separation plant in nonferrous industry
Formulate construction guidelines for non-ferrous metal intelligent mines and factories, and guide the construction of industry intelligent standardization. Reducing production energy efficiency and overall controllable cost, promoting the rapid iteration of production equipment and improving enterprise profits are the problems that need to be solved urgently in current industry. Recently, DEAR air separation cooperated with customers and signed a 2400/1000-type small and medium-sized air separation plant project, which was highly recognized by customers through reasonable scheme design.
Faq of Welding requirements for large air separation unit
More
Why only cryogenic air separation equipment can be selected for large industrial gas?
Mar 19, 2026
Why is pressure maintenance required for cold box of air separation equipment? What is the core purpose?