Common faults of air separation unit system

Common faults of air separation unit system
Air separation unit maintenance procedures need to determine the maintenance cycle and content, maintenance quality standards, commissioning and acceptance maintenance and troubleshooting. Before the maintenance, the staff should prepare the air separation unit maintenance procedures according to the regulations, so as to avoid missing items and causing unnecessary economic losses. The staff should be familiar with the common faults of air separation unit system and deal with the emergency situation in time.
News of Common faults of air separation unit system
More
Sep 30, 2020
On September 24, a delegation from QinZhou Federation of Industry and Commerce of Guangxi province came to DEAR air separation for investigation and i
Jul 24, 2020
On July 22, the signing ceremony of Kaifeng Kehui-DEAR project between Kaifeng DEAR air separation and Zhengzhou Kehui Technology was successfully hel
Albums of Common faults of air separation unit system
More
Solutions of Common faults of air separation unit system
More
Large air separation plant KDON-20000/20000 solution for metallurgical industry
DEAR air separation has cooperated with customers in metallurgical industry domestic and abroad in many projects, and has rich project experience. DEAR has continuously invested in the research and development of large-scale air separation plant. In view of metallurgical industry, DEAR combined with the characteristic of this industry, develops high-efficiency energy-saving air separation plant, to meet the needs of large and medium customers. DEAR air separation uses the rapid development of internet technology to establish a remote monitoring system to collect real-time operation data of each air separation plant, and provides the best suggestions for users by using big data analysis.
Large air separation plant KDON-16000/35000 solution for metallurgical industry
Metallurgical industry is an industry to develop metal mineral resources and produce various kinds of raw materials for metal products. With the progress of science and technology, the metallurgical industry has new requirements for the process, process, management and application research and development of air separation plant. The air separation plant also has the following development trends: first, large-scale and cluster; second, the core technology is gradually localization; third, refinement, which needs to develop high-efficiency energy-saving technology for different application fields; fourth, highly automated and intelligent, reduce manual operation as far as possible, and gradually establish a remote monitoring system by using the rapid development of internet technology to collect in real time according to the operation data of air separation plant, using big data analysis to provide the best suggestions for users, etc. KDON (Ar) - 16000 / 35000, a large scale air separat
Faq of Common faults of air separation unit system
More
1. When working at a height of more than 2 meters or multilevel cross operation, special personnel shall be assigned to guard or contact with each other, and it is strictly forbidden to command by more than one person. 2. The safety belt must be worn when working at a height of more than 2 meters, and it should be hung high and low. It is forbidden to hang the safety belt on the maintenance objects, on the pipelines and equipment (including electrical) of various dangerous media, and it is forbidden to drag the safety belt on the ground. It is strictly forbidden to use nylon material safety belt in high-temperature area or welding operation, and the flame-retardant and high-temperature resistant safety belt should be selected. 3. If there are high falling objects, the articles should be cleaned up in time, or the falling prevention measures should be added. 4. The safety rope should be lowered from the top of the silo as the hanging point of the safety belt for the high-altitu
Jan 15, 2025
When the power supply of the air separation unit of the molecular sieve adsorption purification process is resumed after the power failure, the operation should be conducted according to the following steps: 1) the possible influence on the mechanical equipment such as the air compressor when the power is suddenly cut off should be judged. If there is no influence, start-up preparation of the air compressor according to the operation specification of the air compressor; 2) check and confirm the switch state of the chain shutdown equipment valve; 3) check and confirm the alarm chain project of the air separation plant. Re-check and confirm the chain control of failure during power failure; 4) start the air compressor and air precooling system according to regulations; 5) start the molecular sieve adsorber according to regulations. Continue to complete the process before shutdown. If the downtime is long (more than 24 hours), the molecular sieve adsorber should recycle for one cycle; ...