1) According to the general production plan of the project, arrange the entry plan of the project's machines and tools, and organize the entry of the machines and tools according to the plan.
2) According to the workload of the project, combined with personnel dispatch and grouping plan, put forward the accurate use plan of tools.
3) Arrange the site storage place and storage method of tools to ensure the smooth implementation of the project.
4) All machines and equipment entering and leaving the site shall be recorded.
5) All equipment and machines shall be inspected before entering the site to ensure that they are in good condition and meet the needs of production and construction.