International cooperation of air separation equipment

International cooperation of air separation equipment
Faq of International cooperation of air separation equipment
More
When the new air separation plant is purged the first time, the air compressor pressure shall be increased to the quota pressure as far as possible. The purge valve should be fully opened as far as possible. Since the drain valve is connected together, the pressure is different. Therefore, when purging the drain valve, should purge one by one, and then close one after another for half an hour. After purging, do not fully close the purge and drain valves. Shut down the air compressor and wait until there is no pressure. Take all the valve bodies of the purge and discharge valves to check and clean, and then restore them. Only in this way can the purging be qualified.
Aug 19, 2024
How should the molecular sieve adsorption purification process be operated when the air separation equipment resumes power supply after a power outage?
Jun 18, 2024
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top