Arrangement and preparation of site environment in early stage of air separation project

Arrangement and preparation of site environment in early stage of air separation project
1) For the arrangement and preparation of on-site access, the general contractor shall cooperate to achieve "three connections and one leveling" before entering the site. 2) Negotiate in advance to solve the basic conditions of office such as water point, power access point and communication means on the construction site. At the same time, it is necessary to solve the problems of leasing the processing site and the living quarters of the construction personnel nearby, so that the processing and production sites must be clean and orderly. 3) Implement the relevant conditions of the construction site, and implement the layout of water, electricity and temporary lighting for construction. 4) Implementation of various construction machines and tools on site. 5) Implement the layout of safety passage and emergency exit on the construction site, draw the emergency escape passage diagram, and implement relevant safety protection measures.
News of Arrangement and preparation of site environment in early stage of air separation project
More
Aug 26, 2021
On 26 April, Dear Air Separation was awarded as 2021 Provincial ‘professionalism, refinement, distinctiveness, innovation’ small and medium-sized ente
Aug 19, 2021
On August 6th, Kaifeng Dear Air Separation Industry Co., Ltd. cooperated with Qinghai Asia Silicon Semiconductor Co., Ltd. for the third time and sign
Albums of Arrangement and preparation of site environment in early stage of air separation project
More
Faq of Arrangement and preparation of site environment in early stage of air separation project
More
Test process of stainless steel pipe in air separation unit
Dec 20, 2024
Installation process of chemical pipeline of air separation unit
Aug 15, 2024
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top