One-week project progress (2012.8.20 -- 2012.8.26)

One-week project progress (2012.8.20 -- 2012.8.26)
Aug 20, 2012
Author: DEAR AST

One-week project progress --- 1500 project of exporting to Burma
● Burma iron and steel company KDON (Ar)-1500 40Y/1500/40Y complete air separation engineering project supporting oxygen compressor equipment is expected to be delivered around 23rd day of this month.

● The final preparation work before the Burma Project's matching distillation column system, purification system and other storage equipment are being sent to the port is under tense.

One-week project progress --- Minyuan 15000 project
● Minyuan KDON (Ar)-15000/15000-500 complete set of air separation engineering project supporting relevant main Cold cylinder production finished shooting, will enter the plate heat exchanger unit installation phase, is expected to be completed in early September; the tube body of the lower tower has been welded and pressed, and the tower plate is being assembled, which is expected to be completed by the end of this month; the argon Tower and the lower tower equipment are being manufactured by the plate welding branch factory.
● The matching water cooling tower of Minyuan 15000 project has been manufactured by container branch factory.

One-week project progress --- Linyi 10000 project
● The Design and Research Institute of the company is in charge of the drawings design part of the seventh set of air cooling tower and molecular sieve equipment signed by Shandong Linyi Sande Special Steel Co., Ltd. of KDON-10000/10000 air separation project, which has completed the drawings review.

One-week project progress --- Shangu 36000 project
● Design and Research Institute of the company signed 36000 m with Xi'an Shangu Power Co., Ltd.3/H supply contract of air separation plant carry out design work of relevant equipment drawings currently, the design of some equipment drawings is expected to be preliminarily completed this week.


 

DEAR Air Separation provides you withOne-week project progress (2012.8.20 -- 2012.8.26), so you can fully understand the latest developments of DEAR Air Separation and the interpretation of DEAR News.
Need more information?
Contact us for more details about our air separation equipment, solutions and services.
Products
  • Large air separation
  • Small air separation
  • High purity nitrogen air separation
  • Liquefaction air separation
  • Complete air separation
  • Biogas purification
  • Air separation parts
Need more information?
Tel:+86-19837850537
© Kaifeng DEAR Air Separation Industry Co., Ltd.. All rights reserved.
Online
Inquiry
Email
Top