The KDON (Ar)-7500/15000-230 complete set of air separation plant signed by our company and Guangxi Chuangui has all completed the production. After loading and sending to the construction site, the equipment will be installed, constructed and debugged.
This figure shows the loading site of molecular sieve adsorber
This picture is the loading site of the upper section of the crude argon Tower I.